| Date |
Text |
| 2017-06-21 13:25:20 | 1ST REVIEW FBC-2014 MECHANICAL, EXISTING, ENERGY |
| | CONSERVATION CODES. |
| | PERMIT #17060677 |
| | 6/21/17 |
| | |
| | 1) SUBMIT TWO COPIES OF THE DEVELOPMENT SERVICES |
| | DEPARTMENT AC CHANGEOUT FORM FOR THE REPLACED 15-TON |
| | AIR HANDLER AND THE TWO 6-TON CONDENSER UNITS. |
| | |
| | 2) REFER TO SECTION C101.4.7 EXCEPTIONS FBC-14 ENERGY |
| | CONSERVATION: MATCHING SYSTEMS ARE REQUIRED FOR |
| | REPLACEMENT OF THE 15-TON SYSTEM AND THE MATCH MUST BE |
| | VERIFIED BY ANYONE OF THE FOLLOWING MEANS: A) AHRI |
| | CERTIFICATE B) ACCREDITTED LABORATORY C) MANUFACTURER'S |
| | LETTER D) LETTER FROM A FL. REGISTERED PROFESSIONAL |
| | ENGINEER. |
| | |
| | 3) MECHANICAL PLAN M3.01: PROVIDE AN AC EQUIPMENT |
| | SCHEDULE ON THE PLAN. |
| | |
| | 4) M3.01: INDICATE THE TYPE OF RETURN AIR DOOR TO BE |
| | INSTALLED AT THE MECHANICAL/ELECTRICAL ROOM. PLEASE |
| | NOTE THAT THE DOOR SHALL BE NON-COMBUSTIBLE PER SECTION |
| | C403.2.7.2 FBC-14 ENERGY CONSERVATION, AND SECTION 602 |
| | FBC-14 MECHANICAL. PLEASE REVIEW ALL SUB-SECTIONS OF |
| | SECTION 602 FOR ALL MATERIALS ALLOWED TO BE IN THE |
| | PLENUM INCLUDING ELECTRICAL EQUIPMENT AND WIRING, FOAM |
| | PLASTIC ETC. PLEASE NOTE THAT NO FUEL-FIRED APPLIANCES |
| | OR EQUIPMENT ARE PERMITTED TO BE LOCATED IN THE ROOM- |
| | SECTION 602.1. |
| | |
| | 5) M3.01: REFER TO SECTION 606.2.1 FBC-14 MECHANICAL |
| | AND SHOW THE LOCATION(S) OF THE REQUIRED SMOKE |
| | DETECTOR(S) IN THE MECHANICAL ROOM. |
| | |
| | 6) M3.01: REFER TO SECTION 809.2 FBC-14 EXISTING |
| | BUILDING CODE AND PROVIDE MINIMUM VENTILATION |
| | CALCULATIONS FOR ALL ROOMS AND SPACES PER TABLE 403.3 |
| | FBC-14 MECHANICAL. PROVIDE A SCHEDULE THAT INDICATES |
| | THE REQUIRED AND PROVIDED CFMS OF OUTDOOR AIR. |
| | |
| | 7) A3.01 & M3.01: THE TWO NEW OFFICES 102, AND |
| | EXECUTIVE OFFICE102 ROOMS BEING CREATED WILL REQUIRE |
| | RETURN AIR TO ACHIEVE BALANCED AIR FOR THE SYSTEM- |
| | SECTION 601.5. PLEASE PROVIDE DETAILS AND INDICATE THE |
| | AMOUNT OF SUPPLY CFMS AT EACH DIFFUSER LOCATION IN THE |
| | NEW ROOMS. IT MAY BE HELPFUL FOR THE DESIGN |
| | PROFESSIONAL TO ASSIGN DIFFERENT ROOM NUMBERS TO EACH |
| | OF THE THREE OFFICES. |
| | |
| | 8) M3.01: PROVIDE EXHAUST VENTILATION FOR THE NEW |
| | TOILET ROOMS- TAVBLE 403.3. |
| | |
| | 9) SHOW THE LOCATIONS OF THE NEW 6-TON CONDENSERS AND |
| | PROVIDE WIND LOAD ENGINEERING FOR INSTALLATION- SECTION |
| | 301.15 FBC-14 MECHANICAL. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |