| Date |
Text |
| 2017-06-21 10:13:36 | E-MAIL RESPONSE FROM MARK CONRAD: |
| | HI MR. GOMEZ-THANKS FOR YOUR EMAIL-ATTACHED IS THE |
| | QUOTE FROM MY TILE GUY TO PERFORM THE WORK AT 300 |
| | AUSTRALIAN UNIT 213-I DID NOT INCLUDE MY 20% |
| | PROFIT/OVERHEAD TO PERMIT VALUE-WILL THIS BE SUFFICIENT |
| | DOCUMENTATION? AS FOR SOUND MEMBRANE DOCUMENTATION-I |
| | BELIEVE WE INADVERTENTLY GAVE THIS TO THE BUILDING |
| | MANAGER SO I WILL BE SURE TO FORWARD THIS DOCUMENTATION |
| | TO YOU? WILL THIS BE SATISFACTORY TO ALLOW FOR THE |
| | RELEASE OF THIS PERMIT? THANKS VERY MUCH-MARK CONRAD. |
| | |
| | |
| | RESPONSE TO MARK CONRAD: |
| | 1- REGARDING THE SOUND MEMBRANE DOCUMENTATION, PLEASE |
| | MAKE SURE COPIES OF THE TESTS ARE FOR THE ACTUAL |
| | ASSEMBLY OF THIS BUILDING. REVIEW THE DOCUMENTATION |
| | BEFORE SUBMITTAL. CHECK THE THICKNESS OF THE CONCRETE |
| | SLAB AND IF ACOUSTICAL CEILING IS CONSIDERED IN THE |
| | TESTS. SEE ITEMS A,B AND C OF ITEM #1 BELOW. |
| | |
| | 2- REGARDING THE VALUE. IT LOOKS LIKE THE ESTIMATE |
| | SUBMITTED IS ONLY FOR INSTALLATION AND OWNER IS |
| | SUPPLYING THE MATERIALS. NEED TO INCLUDE THE COST OF |
| | ALL MATERIALS IN THE VALUATION. |
| | |
| | |
| | RESIDENTIAL (R2) ALTERATION. BUILDING REVIEW COMMENTS. |
| | CODE: FBC 5TH EDITION (2014). |
| | |
| | 1- SOUND INSULATION MATERIAL SUBMITTED: |
| | A) PROVIDE 2 COPIES OF THE FLAME SPREAD INDEX AND SMOKE |
| | DEVELOPED TEST DONE IN ACCORDANCE WITH ASTM E 84 OR UL |
| | 723 AS REQUIRED BY SEC. 720.1 OF FBC 5TH EDITION |
| | (2014). |
| | |
| | B) PROVIDE 2 COPIES OF THE SOUND TRANSMISSION CLASS |
| | (STC) TEST DONE IN ACCORDANCE WITH ASTM E 90 AS |
| | REQUIRED BY SEC. 1207.2 OF FBC 5TH EDITION (2014). |
| | |
| | NOTE: TEST SAMPLE TO MATCH ACTUAL BUILDING |
| | CONSTRUCTION. TECHNICAL DATA SUBMITTED SHOWS THAT THE |
| | TESTS WERE CONDUCTED ON 8" CONCRETE SLAB WITH |
| | ACOUSTICAL CEILING. THIS ASSEMBLY DOESN'T MATCH THE |
| | ASSEMBLY ON THIS BUILDING. THIS BUILDING HAS A 7" |
| | CONCRETE SLAB AND THERE IS NO ACOUSTICAL CEILING. THERE |
| | ARE TESTS FOR 6" CONCRETE SLABS WITHOUT ACOUSTICAL |
| | CEILING. PROVIDE INFORMATION THAT MORE CLOSELY MATCHES |
| | THIS BUILDING ASSEMBLY. |
| | |
| | C) PROVIDE 2 COPIES OF THE IMPACT INSULATION CLASS |
| | (IIC) TEST DONE IN ACCORDANCE WITH ASTM E 492 AS |
| | REQUIRED BY SEC. 1207.3 OF FBC 5TH EDITION (2014). |
| | |
| | NOTE: TEST SAMPLE TO MATCH ACTUAL BUILDING |
| | CONSTRUCTION. TECHNICAL DATA SUBMITTED SHOWS THAT THE |
| | TESTS WERE CONDUCTED ON 8" CONCRETE SLAB WITH |
| | ACOUSTICAL CEILING. THIS ASSEMBLY DOESN'T MATCH THE |
| | ASSEMBLY ON THIS BUILDING. THIS BUILDING HAS A 7" |
| | CONCRETE SLAB AND THERE IS NO ACOUSTICAL CEILING. THERE |
| | ARE TESTS FOR 6" CONCRETE SLABS WITHOUT ACOUSTICAL |
| | CEILING. PROVIDE INFORMATION THAT MORE CLOSELY MATCHES |
| | THIS BUILDING ASSEMBLY. |
| | |
| | 2- VALUATION DECLARED IN THE PERMIT APPLICATION IS TOO |
| | LOW. VALUATION TO INCLUDE ALL LABOR, MATERIALS AND |
| | CONTRACTOR'S OVERHEAD AND PROFIT AS REQUIRED BY SEC. |
| | 109.3 CITY AMENDMENTS. NOTE: PROVIDE COPY OF SIGNED |
| | CONTRACT FOR ALL SCOPE OF WORK TO BE DONE FOR BUILDING |
| | OFFICIAL APPROVAL. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |