| 2018-01-22 11:14:38 | 1ST REVIEW: FBC 2014 5TH EDITION |
| | |
| | GAS COMMENTS: THE EXISTING GAS SYSTEM SHALL BE SIZED TO |
| | ACCOMMODATE NEW BTU LOAD. |
| | |
| | 1. PLEASE INDICATE ON THE GAS RISER THE SYSTEM PRESSURE |
| | AND TYPE OF PIPE BEING USED. PER WPB AMEND TO FBC |
| | 107.2.1 |
| | |
| | 2. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, |
| | (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING |
| | AND/OR SYSTEM PER THE FBC-2014 FUEL GAS APPENDIX A ? |
| | USE OF CAPACITY SECTION A.3.1(4) & 2014 FUEL GAS CODE |
| | SEC. 402.4.1. |
| | |
| | 3. ON THE GAS RISER NEXT TO THE NEW FRYER IT SHOWS EX. |
| | 1/2" CWL STOVE WHAT IS THIS FOR IT IS NOT SHOWN ON THE |
| | PLAN OR EQUIPMENT SCHEDULE PLEASE CLARIFY. PER WPB |
| | AMEND TO FBC 107.2.1 |
| | |
| | 4. THERE ARE TWO DIFFERENT MANUFACTURE SPEC SHEETS FOR |
| | THE FRYER PLEASE CLARIFY WHICH MANUFACTURE AND MODEL # |
| | IS BEING USED. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 5. THE COMBUSTION AIR CALCULATIONS SHOWS A TOTAL BTU |
| | LOAD OF 166,000 THE PLAN SHOWS 589,000 PLEASE PROVIDE |
| | AN ACCURATE COMBUSTION AIR CALCULATION. PER FBC FG 304 |
| | |
| | 6. THE EQUIPMENT SCHEDULE SHOWS THE FRYER AS EXISTING |
| | THE PLAN SHOWS IT AS NEW PLEASE CLARIFY. PER WPB AMEND |
| | TO FBC 107.2.1 |
| | |
| | 7. PLEASE PROVIDE THE SIZING TABLE USED IN SIZING |
| | SYSTEM FROM FBC FG 402 |
| | |
| | 8. IS THERE A ANSUL SYSTEM EXITING PLEASE INDICATE ON |
| | RISER . PER WPB AMEND TO FBC 107.2.1 |
| | |
| | |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |