| Date |
Text |
| 2017-06-12 15:47:43 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | 1) THERE ARE NO REFERENCES OF COMPLIANCE WITH ANY FIRE |
| | CODE. |
| | |
| | THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE |
| | 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING |
| | THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER |
| | APPLICABLE CODES OR STANDARDS. |
| | |
| | CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 241, 2009 EDITION. |
| | |
| | ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION. |
| | |
| | PLEASE ENSURE COMPLIANCE AND PROVIDE AN APPLICABLE NOTE |
| | ON THE SUBMITTAL. |
| | |
| | |
| | |
| | 2) ALL SUBMITTED SHEETS - FLOORING AND SOUND BARRIERS |
| | ARE BEING PROPOSED FOR THIS PROJECT. THERE ARE NO |
| | PRODUCT SUBMITTALS. |
| | |
| | 31.3.3.3 INTERIOR FLOOR FINISH. IN BUILDINGS UTILIZING |
| | OPTION 1 OR OPTION 2, NEWLY INSTALLED INTERIOR FLOOR |
| | FINISH IN EXITS AND EXIT ACCESS CORRIDORS SHALL BE NOT |
| | LESS THAN CLASS II IN ACCORDANCE WITH 10.2.7. |
| | |
| | YOUR BUILDING DOES NOT HAVE A SUPPRESSION SYSTEM BUT |
| | DOES HAVE A FIRE ALARM, USING (2) OPTION 2, BUILDINGS |
| | PROVIDED WITH A COMPLETE APPROVED AUTOMATIC FIRE |
| | DETECTION AND NOTIFICATION SYSTEM IN ACCORDANCE WITH |
| | 31.3.4.4 |
| | |
| | 10.2.7 INTERIOR FLOOR FINISH TESTING AND |
| | CLASSIFICATION. |
| | 10.2.7.1 CARPET AND CARPETLIKE INTERIOR FLOOR FINISHES |
| | SHALL COMPLY WITH ASTM D 2859, STANDARD TEST METHOD FOR |
| | IGNITION CHARACTERISTICS OF FINISHED TEXTILE FLOOR |
| | COVERING MATERIALS. |
| | 10.2.7.2* FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH |
| | 10.2.2.2 ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, |
| | SHALL HAVE A MINIMUM CRITICAL RADIANT FLUX OF 0.1 |
| | W/CM2. |
| | 10.2.7.3* INTERIOR FLOOR FINISHES SHALL BE CLASSIFIED |
| | IN ACCORDANCE WITH 10.2.7.4, BASED ON TEST RESULTS FROM |
| | NFPA 253, STANDARD METHOD OF TEST FOR CRITICAL RADIANT |
| | FLUX OF FLOOR COVERING SYSTEMS USING A RADIANT HEAT |
| | ENERGY SOURCE, OR ASTM E 648, STANDARD TEST METHOD FOR |
| | CRITICAL RADIANT FLUX OF FLOOR COVERING SYSTEMS USING A |
| | RADIANT HEAT ENERGY SOURCE. |
| | 10.2.7.4 INTERIOR FLOOR FINISHES SHALL BE CLASSIFIED AS |
| | FOLLOWS IN ACCORDANCE WITH THEIR CRITICAL RADIANT FLUX |
| | VALUES: |
| | (1) CLASS I INTERIOR FLOOR FINISH SHALL BE |
| | CHARACTERIZED BY A CRITICAL RADIANT FLUX NOT LESS THAN |
| | 0.45 W/CM2, AS DETERMINED BY THE TEST DESCRIBED IN |
| | 10.2.7.3. |
| | (2) CLASS II INTERIOR FLOOR FINISH SHALL BE |
| | CHARACTERIZED BY A CRITICAL RADIANT FLUX NOT LESS THAN |
| | 0.22 W/CM2 BUT LESS THAN 0.45 W/CM2, AS DETERMINED BY |
| | THE TEST DESCRIBED IN 10.2.7.3. |
| | |
| | |
| | PLEASE PROVIDE MANUFACTURES SPECIFICATION SHEETS THAT |
| | COMPLY WITH THE ABOVE CODES AND STANDARDS. |
| | |
| | |
| | |
| | 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |