| Date |
Text |
| 2018-05-23 08:40:46 | 4TH REVIEW FBC-2014 RESIDENTIAL MECHANICAL |
| | PERMIT #17060212 |
| | 5/22/18 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | THE FOLLOWING REVIEW IS BASED ON THE NEW MECHANICAL |
| | PLANS AND SPECIFICATIONS SUBMITTED. THE VOIDED PLANS |
| | WERE NOT RETURNED WITH THE NEW PLAN SHEETS. |
| | |
| | 1) SHEET M-2: THE RETURN TRANSFER DUCTS FROM THE |
| | BEDROOMS ARE UNDERSIZED PER SECTION M1602.4 ITEMS 1 & 2 |
| | FBC-14 RESIDENTIAL. BECASUE ALL BEDROOMS ARE MASTER |
| | SUITES CONTAINING BATHS AND CLOSET, AND EACH IS BEING |
| | SUPPLIED BY A 16" X 10" DUCT, THEN EACH WILL REQUIRE A |
| | TRANSFER DUCT WITH A MINIMUM CROSS SECTION AREA OF 240 |
| | SQ. INCHES, |
| | |
| | 2) THE SUBMITTAL FOR THE EXHAUST HOOD INDICATES A |
| | MAXIMUM EXHAUST RATE OF 900 CFMS WHICH WILL REQUIRE |
| | MAKEUP AIR TO BE PROVIDED PER SECTION M1503.4. THE |
| | MAKEUP AIR SYSTEM SHALL BE EQUIPPED WITH A MEANS OF |
| | CLOSURE, AND SHALL BE AUTOMATICALLY CONTROLLED TO START |
| | AND OPERATE SIMULTANEOUSLY WITH THE EXHAUST SYSTEM. |
| | |
| | 3) THE AHRI CERTIFICATES DO NOT MATCH WITH THE NEW 4 |
| | AND 2.5-TON AC SYSTEMS SELECTED AND SHOWN IN THE |
| | SCHEDULES ON M-2. |
| | |
| | 4) THE RESCHECK ENERGY EFFICIENCY CERTIFICATE DOES NOT |
| | PROVIDE ANY COMPLIANCE DATA FOR THE AC SYSTEMS OR THE |
| | WATER HEATER. |
| | |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |