| Date |
Text |
| 2017-06-20 11:26:45 | 1ST REVIEW: FBC 2014 5TH EDITION |
| | |
| | GAS COMMENTS: |
| | |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL |
| | CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER |
| | FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4.2. |
| | |
| | 2. TYPE OF GAS, (LP OR NATURAL). THE PLAN SHOWS BOTH |
| | PROPANE AND NATURAL PLEASE CLARIFY. PER WPB AMEND TO |
| | FBC 107.2.1 |
| | |
| | 3.SHOW THE DISTANCE FROM THE POINT OF DELIVERY, |
| | (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING |
| | AND/OR SYSTEM PER THE FBC-2014 FUEL GAS APPENDIX A ? |
| | USE OF CAPACITY SECTION A.3.1(4) & 2014 FUEL GAS CODE |
| | SEC. 402. THERE ARE CONFLICTING MEASUREMENTS PLEASE |
| | CLARIFY PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 4.SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL |
| | GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA |
| | 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2 |
| | |
| | 5. IS THIS A 5LB SYSTEM RESIDENTIAL SYSTEMS ARE |
| | TYPICALLY 2LB OR .05LB PLEASE CLARIFY. PER WPB AMEND TO |
| | FBC 107.2.1 |
| | |
| | 6. YOU HAVE NOTED ON THE RISER DIAGRAM THE USE OF ANSUL |
| | VALVES ON EVERY APPLIANCE PLEASE PROVIDE MANUFACTURE |
| | SPEC FOR THESE VALVES WE DO NOT TYPICALLY SEE THESE ON |
| | RESIDENTIAL SYSTEMS IS THIS A FIRE SUPPRESSION SYSTEM |
| | VALVE PLEASE CLARIFY PER WPB AMEND TO FBC 107.2.1 |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |