| Date |
Text |
| 2017-07-28 08:12:51 | 1ST REVIEW FBC-2014 MECHANICAL |
| | PERMIT #17060195 |
| | 7/28/17 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) COMPLY WITH FIRE AND PLUMBING PLAN REVIEW COMMENTS. |
| | |
| | 2) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE TANKS. |
| | INDICATE ON THE PLAN COMPLIANCE WITH SECTION 4.3.5.1(1) |
| | & (2) NFPA 30A FOR FIRE RESISTIVE PROTECTION AND |
| | EMERGENCY VENTING SIZING. |
| | |
| | 3) SHOW COMPLIANCE WITH TABLE 4.3.2.4 NFPA 30A FOR |
| | MINIMUM SEPARATION REQUIREMENTS FOR THE TANKS TO |
| | NEAREST IMPORTANT BUILDING ON THE SAME PROPERTY, FROM |
| | LOT LINES, FROM THE PUBLIC WAY, AND BETWEEN TANKS. |
| | ADDITIONALLY SEPARATION COMPLIANCES ARE LISTED IN |
| | TABLES 22.4.1.1(A) & 22.4.1.1(B) NFPA 30- PLEASE SHOW |
| | COMPLIANCE. |
| | |
| | 4) SHOW COMPLIANCE WITH SECTION 4.3.6.3 NFPA 30A FOR A |
| | MEANS TO PROVIDE AN AUDIBLE ALARM WHEN THE LIQUID LEVEL |
| | IN THE TANKS REACHES 90 PERCENT OF CAPACITY, AND FOR A |
| | MEANS TO AUTOMATCALLY STOP THE FLOW OF LIQUID INTO THE |
| | TANK WHEN THE LEVEL REACHES 98 PERCENT CAPACITY OR TO |
| | RESTRICT THE FLOW RATE OF 9.5 L/MIN (2.5 GPM) WHEN THE |
| | LIQUID IN THE TANK REACHES 95 PERCENT CAPACITY. |
| | |
| | 5) THE FRONT GATES TO THE TANK BUILDING SHALL BE |
| | MINIMUM 6 FT. HIGH, SHALL HAVE A MINIMUM SEPARATION OF |
| | 3 FT. TO THE TANKS, AND SHALL HAVE GATES THAT ARE |
| | SECURED AGAINST ENTRY. PLEASE PROVIDE DETAILS INCLUDING |
| | PLAN AND ELEVATION VIEWS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |