| 2017-06-28 13:41:54 | 1ST REVIEW: FBC 2014 5TH EDITION |
| | |
| | PLUMBING COMMENTS: |
| | |
| | 1. THE RELOCATED VENT TERMINAL NEXT TO NEW MECHANICAL |
| | RM TG326 SHALL COMPLY-WITH FBC PL 903.5 LOCATION OF |
| | VENT TERMINAL. |
| | AN OPEN VENT TERMINAL FROM A DRAINAGE SYSTEM SHALL NOT |
| | BE LOCATED DIRECTLY BENEATH ANY DOOR, OPENABLE WINDOW, |
| | OR OTHER AIR INTAKE OPENING OF THE BUILDING OR OF AN |
| | ADJACENT BUILDING, AND ANY SUCH VENT TERMINAL SHALL NOT |
| | BE WITHIN 10 FEET (3048 MM) HORIZONTALLY OF SUCH AN |
| | OPENING UNLESS IT IS 3 FEET (914 MM) OR MORE ABOVE THE |
| | TOP OF SUCH OPENING. |
| | |
| | 903.6 EXTENSION THROUGH THE WALL. |
| | VENT TERMINALS EXTENDING THROUGH THE WALL SHALL |
| | TERMINATE AT A POINT NOT LESS THAN 10 FEET (3048 MM) |
| | FROM A LOT LINE AND NOT LESS THAN 10 FEET (3048 MM) |
| | ABOVE AVERAGE GROUND LEVEL. VENT TERMINALS SHALL NOT |
| | TERMINATE UNDER THE OVERHANG OF A STRUCTURE WITH SOFFIT |
| | VENTS. SIDE WALL VENT TERMINALS SHALL BE PROTECTED TO |
| | PREVENT BIRDS OR RODENTS FROM ENTERING OR BLOCKING THE |
| | VENT OPENING. |
| | |
| | 2. HOLDING TANK FOR DECON SHOWER. |
| | A) HOW WILL THIS TANK BE EMPTIED OUT AND WHEN WILL THE |
| | TANK BE EMPTIED. |
| | B) PLEASE PROVIDE MANUFACTURE SPECIFICATION ON THE TANK |
| | AND WATER LEVEL SENSOR. |
| | C) WHAT TYPE OF CHEMICALS COULD BE INTRODUCED INTO THE |
| | TANK. |
| | PER WPB AMEND TP FBC 107.2.1 |
| | |
| | 3. PLEASE PROVIDE TRAP PRIMER FOR THE FLOOR DRAIN IN |
| | THE DECON SHOWER. PER FBC PL 1002.4 |
| | |
| | 4, PLEASE PROVIDE A MEDICAL GAS RISER. PER WPB AMEND TO |
| | FBC 107.3.5.1.3(13) |
| | |
| | 5. TEMPERED WATER SHALL BE DELIVERED FROM LAVATORIES |
| | TEMPERED WATER SHALL BE DELIVERED THROUGH AN APPROVED |
| | WATER-TEMPERATURE LIMITING DEVICE THAT CONFORMS TO ASSE |
| | 1070 OR CSA B125.3. PER FBC PL 416.5 |
| | |
| | 6. LABEL FIXTURES ON RISER FOR BATHROOM TG337. PER WPB |
| | AMEND TP FBC 107.2.1 |
| | |
| | 7. THE BRANCH DRAIN FOR THE BREAKROOM SINK SHALL |
| | CONNECT TO BUILDING DRAIN DOWN STREAM OF BATHROOM GROUP |
| | TG337. PER FBC PL 912.1 |
| | |
| | |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |