| 2017-06-27 10:45:53 | CODES IN EFFECT: |
| | FLORIDA BUILDING CODE 2014 5TH EDITION |
| | FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH |
| | EDITION |
| | NFPA 70 2011 EDITION, NATIONAL ELECTRICAL CODE |
| | |
| | ELECTRICAL REVIEW COMMENTS: |
| | |
| | 1. THE DEMAND AMPS/KVA FOR PANEL EGLB1 EXCEED THE |
| | CAPACITY OF TRANSFORMER T-EGLB1. PROVIDE CORRECTION. |
| | NEC 517.30(D); 230.79 |
| | 2. PROVIDE PANEL SCHEDULE FOR PANEL QDP-B. NEC 408.4; |
| | 215.5; FBC 107.2.1 |
| | 3. SHEET E802, PANEL TDP1, LOAD CALCULATION PROVIDED |
| | SHOWS X-RAY LOAD WITH A 19.17% DEMAND FACTOR, AND |
| | RECEPTACLE LOAD WITH A 78.41% DEMAND FACTOR. PROVIDE |
| | CODE SECTION FROM THE NEC WHERE THESE DEMAND FACTORS |
| | ARE LOCATED AND/OR CORRECT THE DEMAND FACTORS. NEC 220; |
| | FBC 107.2.1 |
| | 4. SHEET E805, PANEL XRH, LOAD CALCULATION PROVIDED |
| | SHOWS X-RAY LOAD WITH A 37.5% DEMAND FACTOR. PROVIDE |
| | CODE SECTION FROM THE NEC WHERE THESE DEMAND FACTORS |
| | ARE LOCATED AND/OR CORRECT THE DEMAND FACTORS. NEC 220; |
| | FBC 107.2.1 |
| | 5. SEVERAL PANEL SCHEDULES SHOW THE LIGHTING DEMAND |
| | FACTOR AT 40% (EXAMPLE PANEL CGHC2 AND GHC2). THE NOTE |
| | AT THE BOTTOM OF TABLE 220.42 STATES THAT THIS DEMAND |
| | FACTOR SHOULD NOT BE USED WHERE IT IS LIKELY THE |
| | LIGHTING WILL BE ON AT THE SAME TIME, SUCH AS THE |
| | TRAUMA ROOMS. PROVIDE CLARIFICATION FOR THIS DEMAND |
| | FACTOR, INDICATING ANY AREAS WHERE LIGHTING WILL BE |
| | USED AT THE SAME TIME. FBC 107.2.1; NEC TABLE 220.42 |
| | 6. SHEET E801 AND E802, ISOLATION PANELS T1A, T1B, T2A, |
| | T2B, T3A, T3B, T4A, T4B: NOTE STATES THAT THE BRANCH |
| | CIRCUITS WILL BE ON A 2 POLE BREAKER, BUT THIS IS NOT |
| | REFLECTED IN THE PANEL SCHEDULE. PROVIDE CORRECTION TO |
| | ACCURATELY REFLECT THE PANEL LAYOUT. FBC 107.2.1; NEC |
| | 408.4 |
| | 7. SHEET E803, PANEL EQH1, LOAD CALCULATION PROVIDED |
| | SHOWS THE MOTOR LOAD WITH A 118.49% DEMAND FACTOR, AND |
| | THE COOLING LOAD WITH A 85% DEMAND FACTOR. PROVIDE CODE |
| | SECTION FROM THE NEC WHERE THESE DEMAND FACTORS ARE |
| | LOCATED AND/OR CORRECT THE DEMAND FACTORS. NEC 220; FBC |
| | 107.2.1 |
| | 8. SHEET E803, PANEL EQL1, LOAD CALCULATION PROVIDED |
| | SHOWS THE COOLING LOAD WITH A 85% DEMAND FACTOR. |
| | PROVIDE CODE SECTION FROM THE NEC WHERE THESE DEMAND |
| | FACTORS ARE LOCATED AND/OR CORRECT THE DEMAND FACTORS. |
| | NEC 220; FBC 107.2.1 |
| | 9. SHEET E804, PANEL TMSB, LOAD CALCULATION PROVIDED |
| | SHOWS THE RECEPTACLE LOAD WITH A 51.04% DEMAND FACTOR, |
| | THE MOTOR LOAD WITH A 118.49% DEMAND FACTOR, THE |
| | COOLING LOAD WITH A 85% DEMAND FACTOR, AND THE X-RAY |
| | LOAD WITH A 19.17% DEMAND FACTOR. PROVIDE CODE SECTION |
| | FROM THE NEC WHERE THESE DEMAND FACTORS ARE LOCATED |
| | AND/OR CORRECT THE DEMAND FACTORS. NEC 220; FBC 107.2.1 |
| | 10. SHEET E804, PANEL TESB, LOAD CALCULATION PROVIDED |
| | SHOWS RECEPTACLE LOAD WITH A 51.06% DEMAND FACTOR, THE |
| | MOTOR LOAD WITH A 118.49% DEMAND FACTOR, THE COOLING |
| | LOAD WITH A 85% DEMAND FACTOR, AND THE X-RAY LOAD WITH |
| | A 19.17% DEMAND FACTOR. PROVIDE CODE SECTION FROM THE |
| | NEC WHERE THESE DEMAND FACTORS ARE LOCATED AND/OR |
| | CORRECT THE DEMAND FACTORS. NEC 220; FBC 107.2.1 |
| | 11. WITH THE CURRENT LOAD CALCULATION PROVIDED, IT |
| | APPEARS GENERATOR #1 IS OVERLOADED. PANEL TESB SHOWS A |
| | DEMAND OF 1027.3 KVA AND THE GENERATOR IS RATED FOR |
| | 1000. IF ANY CORRECTIONS TO LOAD CALCULATIONS FROM |
| | ABOVE COMMENTS RESULT IN ADDITIONAL LOAD, THEN THIS |
| | WILL INCREASE THE OVERLOAD. PROVIDE CLARIFICATION |
| | AND/OR CORRECTION. FBC 107.2.1, NEC 517.30(D) |
| | 12. SHEET E804, PANEL QDP, LOAD CALCULATION PROVIDED |
| | SHOWS THE MOTOR LOAD WITH A 118.49% DEMAND FACTOR. |
| | PROVIDE CODE SECTION FROM THE NEC WHERE THESE DEMAND |
| | FACTORS ARE LOCATED AND/OR CORRECT THE DEMAND FACTORS. |
| | NEC 220; FBC 107.2.1 |
| | 13. PROVIDE AUTOMATIC LIGHTING CONTROLS FOR INTERIOR |
| | LIGHTING PER THE FLORIDA BUILDING CODE ENERGY |
| | CONSERVATION. FBC C401.2.1, C405 |
| | 14. SHEET E901, LIGHTING CONTACTOR DETAIL SHOWS A |
| | PHOTOCELL CONTROLLING THE CONTACTOR. ENERGY CODE |
| | STATES: "EXTERIOR LIGHTING CONTROLS. LIGHTING NOT |
| | DESIGNATED FOR DUSK-TO-DAWN OPERATION SHALL BE |
| | CONTROLLED BY EITHER A COMBINATION OF A PHOTOSENSOR AND |
| | A TIME SWITCH, OR AN ASTRONOMICAL TIME SWITCH. LIGHTING |
| | DESIGNATED FOR DUSK-TO-DAWN OPERATION SHALL BE |
| | CONTROLLED BY AN ASTRONOMICAL TIME SWITCH OR |
| | PHOTOSENSOR. ALL TIME SWITCHES SHALL BE CAPABLE OF |
| | RETAINING PROGRAMMING AND THE TIME SETTING DURING LOSS |
| | OF POWER FOR A PERIOD OF AT LEAST 10 HOURS". PROVIDE |
| | CORRECTION. FBC C405.2.4 |
| | 15. PLEASE INDICATE THE RECEPTACLE CONTROL REQUIRED BY |
| | FBC C401.2 AND ASHREA 90.1: 8.4.2 |
| | 16. INDICATE PANEL BOARD BONDING REQUIRED. NEC 517.14 |
| | 17. SHEETS V106, V206, V306, V406, V506, V606: INDICATE |
| | WHICH MODEL IS USED TO DETERMINE PROPER WIRING |
| | REQUIREMENTS. FBC 107.2.1 |
| | |
| | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN |
| | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES |
| | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE |
| | PREVIOUSLY REVIEWED SHEETS. |
| | |
| | SINCERELY, |
| | |
| | JOHN PEARSON |
| | ELECTRICAL PLANS EXAMINER |
| | 561-805-6746 |
| | [email protected] |
| | |