| | 1. DIGITAL SIGNATURES/SEALS ARE IN ACCORDANCE WITH FS |
| | 471, FS 481 AS NOTED. NEW SHEETS SUBMITTED IN THE NEXT |
| | REVIEW CYCLE REQUIRE REVIEW. |
| | |
| | 2. SOILS REPORT IS NOT DIGITALLY SIGNED AND SEALED. |
| | |
| | 3. LOAD CALCS, JORGE E. REYES, PE - OK |
| | |
| | 4. SURVEY, STEPHEN SHIRLEY, IS NOT DIGITALLY SIGNED AND |
| | SEALED. |
| | |
| | 5. ENERGY CALCS, AC CALCS - OK |
| | |
| | 6. CIVIL PAGES ARE NOT DIGITALLY SIGNED AND SEALED |
| | (FAGAN ENGINEERING, INC.) |
| | |
| | 7. ARCHITECTURAL SHEETS (DANIEL E. ADACHE, RA) HAVE A |
| | DIGITAL SIGNATURE WHICH IS IN COMPLIANCE WITH FS471, |
| | BUT TITLE BLOCK LACKS THE CERTIFICATE OF AUTHORIZATION |
| | REQUIRED BY FS471 AND FAC61G15-23. PLEASE ADD TO YOUR |
| | TITLE BLOCK; NO REVISED SHEETS REQUIRED (UNLESS A |
| | REVISE SHEET IS SUBMITTED FOR ANOTHER REASON) BUT |
| | FUTURE SHEETS ARE TO INCLUDE THIS INFORMATION. |
| | |
| | 8. STRUCTURAL SHEETS (RICARDO A. MADRIZ, PE, MUE |
| | ENGINEERS) OK |
| | |
| | 9. MEP DIGITAL SEALS / SIGNATURES ARE OK BUT ALL PAGES |
| | LACK A TITLE BLOCK IN ACCORDANCE WITH FS471, |
| | FAC61G15-23.002 AS CERTIFICATE OF AUTHORIZATION IS NOT |
| | INCLUDED IN TITLE BLOCK. THE MEP ENGINEER FIRM IS NOTED |
| | AS "TILDEN LOBNITZ COOPER" BUT I WAS UNABLE TO FIND A |
| | CERTIFICATE OF AUTHORIZATION FOR AN ENGINEERING FIRM |
| | WITH THIS NAME. ISN'T THE NAME OF THE ENGINEERING FIRM |
| | "TLC ENGINEERING FOR ARCHITECTURE" (OR SOMETHING |
| | SIMILAR)? THE DBPR WEBSITE SHOWS TWO DIFFERENT C OF A'S |
| | WITH DIFFERENT NAMES (TLC ENGINEERING, TLC ENGINEERING |
| | FOR ARCHITECTURE). |
| | |
| | ELECTRICAL SHEETS (RALPH BAEZA, PE) |
| | MECHANICAL, PLUMBING SHEETS (H. ERICK GONZALEZ, PE) |
| | |
| | |
| | |