| 2017-06-21 17:47:05 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC FIFTH EDITION (2014) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | NOTE: ADDITIONAL SUB-PERMITS ARE REQUIRED FOR ROOFING, |
| | MECHANICAL, ELECTRICAL AND PLUMBING. |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) FBC 107.3.5.3 - PROVIDE A SURVEY/SITE PLAN TO |
| | DEMONSTRATE SETBACKS AND BUILDING SEPARATION |
| | |
| | 2) SHEET A-0 OF THE PLANS REFERENCES THE 2010 FBC. THE |
| | FBC FIFTH EDITION (2014) WENT INTO EFFECT ON JUNE 30, |
| | 2015. ALL NEW PERMITS APPLIED FOR ON OR AFTER THAT DATE |
| | ARE REQUIRED TO COMPLY WITH AND REFERENCE THE FBC FIFTH |
| | EDITION. |
| | |
| | 3) FBC ENERGY CONSERVATION SECTIONS R101.5.1.1.1 OR |
| | R101.5.1.1.2. SUBMIT TWO SETS OF ENERGY COMPLIANCE |
| | FORMS AS REQUIRED. |
| | |
| | 4) PROVIDE WALL SECTIONS TO SHOW THE TIE BEAM, CEILING |
| | INSULATION, SOFFIT VENTS, OVER HANG DIMENSIONS, ETC. |
| | FBC 107.2.1 |
| | |
| | 5) SHOW COMPLIANCE WITH FBC-R 806 FOR ROOF VENTILATION |
| | AND FBC-R807 FOR ATTIC ACCESS. |
| | |
| | 6) SPECIFY THE ROOF SLOPE ON THE PLANS. FBC 107.2.1 |
| | |
| | 7) THE FINISH SCHEDULE ON SHEET A-2 INDICATES THAT |
| | THERE IS NO CEILING IN THE LIVING AREA. PLEASE CLARIFY. |
| | SHOW HOW THE ROOF STRUCTURE WILL BE BRACED TO RESIST |
| | LATERAL LOADS WITHOUT A CEILING DIAPHRAM AND PROVIDE |
| | STRUCTURAL DETAILS ON THE PLANS. FBC 107.2.1.4 & |
| | FBC-R611.10 |
| | |
| | 8) SHOW THE VERTICAL BLOCK REINFORCEMENT THAT IS |
| | REQUIRED AT THE CORNERS AND AT EACH SIDE OF THE |
| | OPENINGS. FBC-R611.8.1.2 |
| | |
| | 9) SHOW THE BLOCK LINTELS OVER THE OPENINGS AND PROVIDE |
| | A LINTEL SCHEDULE. FBC-R611.8.2 |
| | |
| | 10) PROVIDE A ROOF FRAMING PLAN AND SPECIFY THE ROOF TO |
| | WALL CONNECTORS. PROVIDE A ROOF FRAMING ANCHOR |
| | SCHEDULE. FBC-R 611.9.3 & FBC-R802.2 |
| | |
| | 11) SHOW COMPLIANCE WITH FBC-R404.1.6 HEIGHT ABOVE |
| | FINISHED GRADE. CONCRETE AND MASONRY FOUNDATION WALLS |
| | SHALL EXTEND ABOVE THE FINISHED GRADE ADJACENT TO THE |
| | FOUNDATION AT ALL POINTS A MINIMUM OF 4 INCHES (102 MM) |
| | WHERE MASONRY VENEER IS USED AND A MINIMUM OF 6 INCHES |
| | (152 MM) ELSEWHERE. |
| | |
| | 12) FBC107.3.5.3 INDICATE THE MEANS OF TERMITE |
| | PROTECTION PROPOSED PURSUANT TO FBC-R318. |
| | |
| | 13) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS |
| | FOR THOSE PRODUCTS WHICH ARE REGULATED BY FAC |
| | 61G20-3.001 PER FLORIDA STATUTE 553.842 (5) THAT HAVE |
| | BEEN REVIEWED AND APPROVED IN WRITING BY THE DESIGNER |
| | OF RECORD. |
| | |
| | 14) PROVIDE TWO COMPLETE PRODUCT APPROVALS WITH FL OR |
| | NOA NUMBERS INCLUDING INSTALLATION INSTRUCTIONS AND |
| | MAXIMUM DESIGN PRESSURES FOR EACH OF THE ROOF TILE, THE |
| | SELF ADHERING UNDERLAYMENT AND THE ROOF TILE ADHESIVE |
| | (IF IT IS USED). FBC 107.3.4 |
| | |
| | 15) THE INSTALLATION INSTRUCTIONS FOR THE PRODUCT |
| | APPROVALS ARE MISSING INFORMATION. THEY WILL NEED TO BE |
| | REDUCED IN SIZE TO FIT ON THE 8.5" X 11" PAPER WHEN |
| | THEY ARE PRINTED. FBC 107.2.1 |
| | |
| | 16) IN ORDER TO REDUCE PLAN REVIEW TIME, PLEASE SUBMIT |
| | A RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW |
| | COMMENTS HAS BEEN ADDRESSED. |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |