| Date |
Text |
| 2017-05-26 09:32:18 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC FIFTH EDITION (2014) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | FBC 107.2.1 |
| | |
| | 1) SUBMIT DOCUMENTS FROM THE PBC HEALTH DEPARTMENT AS |
| | REQUESTED BY THE PLUMBING COMMENTS. FAC 64E-9 |
| | |
| | 2) PROVIDE A LETTER FROM THE CONDO OWNERS ASSOCIATION |
| | EXPLAINING WHY THE TWO POOLS ARE TO BE REMOVED AND WHAT |
| | IS THE INTENDED USE OF THE AREA AFTER THE POOLS ARE |
| | FILLED. |
| | |
| | 3) PROVIDE A FULL DETAILED SCOPE OF WORK AND SPECIFY IF |
| | THE EXISTING POOL CABANA IS TO REMAIN OR WILL BE |
| | DEMOLISHED ON THE PLANS. |
| | |
| | 4) THE POOL COPING, CONCRETE GUNITE, REINFORCING STEEL, |
| | TILES, COPING AND DECKING MATERIALS ARE REQUIRED TO BE |
| | REMOVED FROM THE SITE AND DISPOSED OF PROPERLY, THEY |
| | CAN NOT BE USED TO FILL THE POOL. |
| | |
| | 5) REMOVE A TWO FOOT SQUARE SECTION OF CONCRETE GUNITE |
| | AT THE BOTTOM OF THE POOL AT THE LOWEST POINT IN THE |
| | DEEP END AND ANOTHER TWO FOOT SQUARE HOLE IN THE |
| | SHALLOW END. |
| | |
| | 6) REMOVE ALL ELECTRICAL CONDUCTORS SERVING THE |
| | ABANDONED POOL FROM THE ELECTRICAL PANEL AND REMOVE OR |
| | CAP THE VACATED CONDUITS. (ELECTRICAL PERMIT REQUIRED) |
| | |
| | 7) REMOVE AND CAP ANY GAS LINES SERVICING THE POOL |
| | HEATER OR SIMILAR ABANDONED GAS FIRED EQUIPMENT. (GAS |
| | PERMIT REQUIRED) |
| | |
| | 8) REMOVE ALL ACCESSORIES, INCLUDING LADDERS, SLIDES |
| | AND DIVING BOARDS. |
| | |
| | 9) AFTER INITIAL INSPECTION, FILL THE POOL WITH GRAVEL, |
| | OR SAND. DEMOLITION MATERIALS OR ROCKS OVER 3/4 INCHES |
| | IN DIAMETER MAY NOT BE USED FOR BACKFILL. |
| | |
| | 10) BACKFILL SHOULD BE PERFORMED IN LIFTS NOT TO EXCEED |
| | EIGHT (8) INCH LAYERS AND COMPACTED TO 90%. |
| | |
| | 11) INSPECTIONS |
| | A MINIMUM OF TWO INSPECTIONS ARE REQUIRED AS FOLLOWS: |
| | 1. IN PROGRESS DEMOLITION INSPECTION TO BE PERFORMED |
| | AFTER THE DEMOLITION AND REMOVAL OF ELECTRICAL AND GAS |
| | LINES BUT PRIOR TO BACK FILL. |
| | 2. FINAL TO BE PERFORMED AFTER THE POOL IS BACKFILLED |
| | AND PROPERLY GRADED. |
| | |
| | IMPORTANT NOTE |
| | ALLOWING THE POOL SHELL TO REMAIN MAY RESULT IN |
| | DIFFERENTIAL SETTLEMENT AND THEREFORE THE POOL AREA MAY |
| | NOT BE USED FOR THE CONSTRUCTION OF FUTURE STRUCTURES. |
| | TO INSURE THAT THE SOIL IS SUITABLE FOR FUTURE |
| | CONSTRUCTION, A REPORT FROM A GEOTECHNICAL ENGINEER |
| | MUST BE PROVIDED AT THE TIME OF PERMIT SUBMITTAL. THAT |
| | REPORT SHALL IDENTIFY ANY SPECIFIC REMOVAL AND |
| | COMPACTION REQUIREMENTS AND SHALL BE NOTED ON THE |
| | SUBMITTED PLANS. |
| | |
| | 12) SUBMIT A COPY OF THE SIGNED CONTRACT WITH THE CONDO |
| | ASSOCIATION TO VERY THE VALUE OF THE WORK. FBC 109.3 |
| | |
| | |
| | |
| | |