| Date |
Text |
| 2017-05-31 06:24:30 | 1) THE SUBMITTED FLOOR PLAN SHOWS PE PIPE BEING RUN |
| | UNDER A COVERED PATIO AND THE BUILDING. THIS IS NOT |
| | PERMITTED PER THE 2014 FBC-FUEL GAS SECTION 404.17.1. |
| | PE PIPE SHALL ONLY BE INSTALLED OUTSIDE UNDERGROUND |
| | 2014 FBC-FUEL GAS SEC.404.17.1, |
| | 2) SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR THE DRYER |
| | THAT IS LOCATED IN THE LAUNDRY ROOM PER THE 2014 |
| | FBC-FUEL GAS CODE SEC.304.1, 614.5 OR 2014 FBC-RES. |
| | SEC. G 2407.1, G2439.4. 2ND REQUEST. |
| | 3) THE GAS RISER SHOWS THE GALVANIZED DROP TO THE NEW |
| | DRYER LOCATION AS 3/4 INCH AND ALSO AS 1/2 INCH. |
| | CLARIFY. |
| | 4) WHAT IS THE LENGTH OF PIPING OF THE 1 INCH RISER AND |
| | 3/4 INCH GALVANIZED PIPE FROM THE METER TO THE |
| | CONNECTION WITH THE 3/4 INCH PE PIPE? THIS DISTANCE |
| | SHALL BE INCLUDED IN THE TOTAL DEVELOPED LENGTHAND |
| | SHALL BE NOTED ON THE PLAN. |
| | 5) THE 1 INCH RISER FROM THE METER IS UNDERSIZED FOR |
| | THE TOTAL BTU LOAD ON SCHEDULE 40 METALLIC PIPE PER THE |
| | SUBMITTED TABLE 402.4 (2). THE TOTAL DEVELOPED LENGTH |
| | TO BE USED FOR SIZING THIS LINE IS 90 FEET SINCE THERE |
| | IS NO 85 FEET ROW IN THE TABLE. THE MINIMUM SIZE FROM |
| | THE METER SHALL BE 1 1/4 INCH ON A SYSTEM THAT IS LESS |
| | THAN 2 PSI WITH A TOTAL BTU LOAD OF 254,000. |
| | 6) SUBMIT TWO COPIES OF THE FLOOR PLAN. WPB AMEND. TO |
| | FBC SEC. 107.1. |
| | 7) SUBMIT TWO COPIES OF SPECS FOR ALL GAS EQUIPMENT.WPB |
| | AMEND. TO FBC SEC. 107.1. |
| | |
| | I SUGGEST CALLING TO SET UP AN APPOINTMENT TO REVIEW |
| | THE PLAN REVIEW COMMENTS. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |