2017-05-19 14:31:14THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
  
  
 1) THE APPLICATION INDICATES A RELOCATION OF TRAILER.
 THERE IS NO INDICATION OF THE PLAN OF THE ORIGINAL
 LOCATION.
  
 PLEASE INDICATE.
  
  
  
 2) I SEEM TO RECALL A PREVIOUS PERMIT FOR THIS PROPOSED
 PROJECT. WAS IT FOF PPRC OR WAS IT FOR A PREVIOUSLY
 ISSUED PERMIT ?
  
 PLEASE CLARIFY.
  
  
  
 3) THE FLOOR PLAN INDICATE OFFICE SPACES, EVEN IN THE
 CENTRAL OPEN AREA. SHEET A001 INDICATES PRO SHOP;
 MERCANTILE.
  
 IS THIS AN OFFICE TRAILER OR A PRO SHOP, MIXED
 OCCUPANCY OR SEPARATED?
  
 PLEASE PROVIDE THE APPLICABLE OCCUPANCY PER NFPA 101,
 5TH EDITION, CHAPTER 6, OCCUPANCY CLASSIFICATION AND
 ENSURE COMPLIANCE.
  
  
  
 4) ON REVIEW OF THE SUBMITTAL, NFPA 241 HAS BEEN
 REVIEWED. THESE TRAILERS ARE USED FOR THE TEMPORAY USE
 OF BUILDINGS UNDER CONSTRUCTION.
  
 THE CONFIGURATION OF THREE TRAILERS TOGETHER
 CONSTITUTIES AS A COMPLEX AND NEEDS TO BE PROTECTED
 ACCORDINGLY.
  
 CHAPTER 4 TEMPORARY CONSTRUCTION, EQUIPMENT, AND
 STORAGE
  
 4.1 APPLICATION. FOR THE PURPOSES OF CHAPTER 4, THE
 TERM TEMPORARY SHALL BE DEFINED AS THE DURATION OF THE
 CONSTRUCTION PROJECT.
 4.2 TEMPORARY OFFICES AND SHEDS.
 4.2.1* SEPARATION DISTANCES BETWEEN BUILDINGS UNDER
 CONSTRUCTION AND CONSTRUCTION-RELATED STRUCTURES, SUCH
 AS TEMPORARY OFFICES, TRAILERS, SHEDS, AND OTHER
 FACILITIES FOR THE STORAGE OF TOOLS AND MATERIALS
 HAVING COMBUSTIBLE CONSTRUCTION OR CONTENTS, SHALL BE
 IN ACCORDANCE WITH TABLE 4.2.1.
  
 4.2.2* DETACHMENT BETWEEN TEMPORARY STRUCTURES,
 ADEQUATE TEMPORARY FIXED FIRE PROTECTION SYSTEMS, AND
 PORTABLE EQUIPMENT SHALL BE PROVIDED AS REQUIRED BY THE
 AUTHORITY HAVING JURISDICTION.
  
 A.4.2.2 WHERE LOCATED 9M(30 FT) OR MORE FROM THE
 STRUCTURE AND CONSTRUCTED OF COMBUSTIBLE MATERIALS, IT
 IS RECOMMENDED THAT TEMPORARY SUPPORT BUILDINGS BE
 DIVIDED INTO SMALL, DETACHED UNITS TO MINIMIZE FIRE
 LOSS. LARGE CONSTRUCTION SUPPORT
 COMPLEXES SHOULD BE PROTECTED WITH ADEQUATE FIRE
 PROTECTION (E.G., AUTOMATIC SPRINKLERS, YARD HYDRANTS,
 HOSE, AND EXTINGUISHERS) AS REQUIRED BY THE AUTHORITY
 HAVING JURISDICTION.
  
  
 TEMPORARY FIRE SPRINKLER PROTECTION IS REQUIRED WITHIN
 THESE TRAILERS. A 13D SYSTEM CAN BE CONSIDERED IN LEIU
 OF NFPA 13 SYSTEM, BASED ON AN EOR REVIEW AND
 SUBMITTAL.
  
 AN ALTERNATIVE COMPREHENSIVE LIFE SAFETY SYSTEMS
 EQUIPMENT INSTALLATION AND WATER SUPPLY REVIEW MAY BE
 CONSIDERED.
  
 PLEASE ADDRESS.
  
  
  
 5) PLEASE CONTACT/COORDINATE WITH THE OFFICE OF THE
 FIRE MARSHAL TO DISCUSS AND/OR CONFIRM INSTALLATION
 WITH FORTHCOMING SHOP DRAWINGS.
  
 PLEASE CLARIFY OR PROVIDE A NOTE OF FIRE SPRINKLER
 INSTALLATION.
  
  
 6) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
 7) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709