| Date |
Text |
| 2017-11-16 13:27:39 | 3RD REVIEW |
| | |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER LL |
| | CITY OF WEST PALM BEACH |
| | DEVELOPMENT SERVICES |
| | BUILDING DIVISION |
| | 561-805-6711 |
| | [email protected] |
| | |
| | PREVIOUS GAS COMMENTS: NOT COMPLIED |
| | |
| | |
| | |
| | 2. THE TANKLESS WATER HEATER SHALL BE MOUNTED 4' AWAY |
| | FROM ALL OPENINGS PLEASE PROVIDE MANUFACTURE |
| | INSTILLATION GUIDE TO VERIFY. PER WPB AMEN TO FBC |
| | 107.2.1 |
| | |
| | 3. SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR ALL |
| | GAS REGULATORS TO VERIFY COMPLIANCE WITH STANDARDS NFPA |
| | 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2 |
| | |
| | 4. PLEASE PROVIDE SEDIMENT TRAPS AT EACH APPLIANCE. PER |
| | FBC FG 408.4 |
| | |
| | 5. SHOW SYSTEM PRESSURE ON RISER DIAGRAM FOR CLARITY IT |
| | SHOWS A REGULATOR AFTER THE METER AND THEN ON AT EACH |
| | APPLIANCE . WPB AMEND TO FBC 107.2.1 |
| | |
| | NEW COMMENTS: |
| | |
| | 1. THE FIRST SECTION OF PE PIPE AFTER METER IS SHOWN AS |
| | 3' 10" ON THE RISER AND 25' 8" ON THE FLOOR PLAN PLEASE |
| | CLARIFY. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 2. THE SIZING TABLES LISTED ON THE PLAN SHT. A-3.1 ARE |
| | .5 PSI SYSTEMS IN THE CODE BOOK BUT ARE SHOWN AS 2 PSI |
| | ON THE PLAN PLEASE CLARIFY. PER WPB AMEND TO FBC |
| | 107.2.1 |
| | |
| | 3. THE GENERAL NOTES ON SHT P-3.1 REFERENCES LP GAS |
| | RISER SHOWS NATURAL GAS PLEASE CLARIFY AND REMOVE |
| | INCORRECT NOTES. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |
| | WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES |
| | AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE |
| | AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW. |
| | |