Plan Review Notes
Plan Review Notes For Permit 17041276
Permit Number 17041276
Review Stop P
Sequence Number 2
Notes
Date Text
2017-09-26 18:00:432ND REVIEW
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
 PLUMBING COMMENTS: 2ND REQUEST NOT COMPLIED A NARRATIVE
 LISTING THE ORIGINAL REVIEW COMMENT NUMBER WITH A
 DESCRIPTION OF THE CHANGES MADE AND IDENTIFYING THE
 SHEET OR SPECIFICATION PAGE WHERE THE CHANGE CAN BE
 FOUND WILL HELP EXPEDITE THE REVIEW.
  
  
 2. THE PLAN DOES NOT INDICATE WHAT TYPE OF OCCUPANCY
 THIS PROJECT IS IF IT IS GOING TO BE MULTI FAMILY
 RESIDENTIAL AN R3 OR R4 THE GROUND FLOOR UNIT WILL HAVE
 TO COMPLY WITH THE FHA DESIGN MANUAL. PLEASE PROVIDE
 TYPE OF OCCUPANCY. PER WPB AMEND TO FBC 107.2.1
  
 3. THE BATHROOMS IN THE GREAT ROOM IS A COMMON AREA AND
 SHALL COMPLY WITH THE FBC ACC 603,604, 606, 609
  
 4. THE TRANSFER SHOWER IN BATHROOM #1 IN UNIT 1A AND 1B
 SHAL BE 36" X 36". PER FBC ACC 608.2.1
  
 5. THE GRAB BARS FOR THE ROLL IN SHOWER IN BATHROOM #1
 IN UNIT 1C SHALL COMPLY WITH. PER FBC ACC 608.3.2
  
 6. SHOW IN ALL ACCESSIBLE BATHROOMS THE CLEAR FLOOR
 SPACE FOR THE TOILET , LAVATORY AND SHOWER. PER FBC ACC
 608.2.1 ,608.2.2.1 ,606.2,604.3.1
  
 7. SHOW HEIGHT DIMENSIONS FOR SHOWER SEATS AND
 CONTROLS. PER FBC ACC 608.5.1 , 610.3 , 608.5.2 ,
 610.3.2, 610.3.1
  
 8. PLEASE LABEL THE SOILSTACKS ON PLAN VIEW TO COINCIDE
 WITH TAGS ON RISER DIAGRAM. PER WPB AMEND TO FBC
 107.2.1,
  
 9. PLEASE PROVIDE WATER RISER DIAGRAM. WPB AMEND TO FBC
 107.3.5.1.3(13)
  
 10. PLEASE PROVIDE COMPLETE SANITARY RISER DIAGRAM. WPB
 AMEND TO FBC 107.3.5.1.3(13)
  
 11. BRANCH DRAIN FOR WASHING MACHINE SHALL BE 3". PER
 FBC PL 406.2
  
 NEW COMMENTS:
  
 1. GRAB BARS SHALL BE ABOVE THE FINISH FLOOR MEASURED
 TO THE TOP OF THE GRIPPING SURFACE. PER FBC ACC 609.4
  
 2. SHOWER SPRAY UNIT SHALL BE INSTALLED ON THE SIDE
 WALL OPPOSITE THE SEAT 38 INCHES MINIMUM AND 48 INCHES
 MAXIMUM ABOVE THE SHOWER FLOOR AND SHALL BE LOCATED ON
 THE CONTROL WALL 15 INCHES (380 MM) MAXIMUM FROM THE
 CENTERLINE OF THE SEAT TOWARD THE SHOWER OPENING. PER
 FBC ACC 608.5.1
  
 3. THE SOIL STACKS FROM SECOND FLOOR SHALL CONNECT TO
 BUILDING DRAIN DOWN STREAM OF FIRST FLOOR BATHROOM
 GROUP. PER FBC PL 912.1
  
 4. A CLEANOUT SHALL BE PROVIDED AT THE BASE OF EACH
 WASTE OR SOIL STACK. PER FBC PL 708.3.4
  
 6. A LENT TRAP IS REQUIRED FOR THE WASHING MACHINES.
 PER FBC PL 1003.6
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES
 AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE
 AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW.
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved