| Date |
Text |
| 2017-05-22 16:43:45 | 1ST REVIEW: FBC 2014 5TH EDITION |
| | |
| | GAS COMMENTS: DENIED 5/22/17 |
| | |
| | 1. THE GAS WATER HEATER ON THE RISER AND GAS FIXTURE |
| | LOAD SUMMERY LIST THE MBH AT 25 ON SHT P-1.0 NOTE #7 IT |
| | LIST THE MBH AT 199 PLEASE CLARIFY PER WPB AMEND TO FBC |
| | 107.2.1 |
| | |
| | 2. THE LONGEST RUN IS LISTED AT 20' THE MEASUREMENTS ON |
| | THE RISER ADD UP TO 56' PLEASE CLARIFY. PER WPB AMEND |
| | TO FBC 107.2.1 |
| | |
| | 3. USING THE LONGEST RUN METHOD OF SIZING, YOUR FIRST |
| | SECTION OF PIPE IS UNDERSIZED PER FBC FG TABLE |
| | 402.4(10(20) IT SHOULD BE 11/4" THE SECTION TO TEE FOR |
| | THE DRYER SHOULD BE 1" THE SECTION TO TANKLESS HEATER |
| | SHOULD BE 1" |
| | |
| | 4. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE |
| | FBC-2014 FUEL GAS CODE SEC. 304. |
| | |
| | 5. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND |
| | TERMINATION OF THE GAS VENTS PER FBC-2014 FUEL GAS CODE |
| | SEC. 502 THRU 505. |
| | |
| | 6. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS AND |
| | INSTALLATION GUIDE FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2014 FUEL GAS SEC. 402.2 |
| | |
| | |
| | |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |