Plan Review Notes
Plan Review Notes For Permit 17040807
Permit Number 17040807
Review Stop P
Sequence Number 3
Notes
Date Text
2018-02-12 07:13:033RD REVIEW: FBC 2014 5TH EDITION
  
 PLUMBING COMMENTS: PREVIOUS COMMENTS NOT COMPLIED
  
 3RD REQUEST 2. PLEASE PROVIDE A FIXTURE COUNT
 BREAKDOWN. PER WPB AMEND TO FBC 107.3.5.1.3
  
 2ND REQUEST 1.THE CIRCUIT VENT CONNECTION SHALL BE
 LOCATED BETWEEN THE TWO MOST UPSTREAM WATER CLOSET
 DRAINS. THE VENT SHALL CONNECT TO THE HORIZONTAL BRANCH
 AND SHALL BE INSTALLED IN ACCORDANCE WITH SECTION 905.
 THE CIRCUIT VENT PIPE SHALL NOT RECEIVE THE DISCHARGE
 OF ANY SOIL OR WASTE. PER FBC PL 914.2
  
 2ND REQUEST 4. CIVIL SHT. #7 OF 8 SHOWS A GAS MAIN
 RUNNING UNDER PROPOSED BUILDING GAS LINES SHALL NOT RUN
 UNDER BUILDING WILL NEED TO BE RELOCATED.PER FBC FG
 404.14
  
 2ND REQUEST 5. THE CIVIL SHT #7 OF 8 THE CONFIGURATION
 OF GREASE INTERCEPTOR DOES NOT MATCH EXISTING
 INSTALLATION UNDER PERMIT 16041215. PLEASE CLARIFY. PER
 WPB AMEND TO FBC 107.2.1
  
 2ND REQUEST 6. PROVIDE DETAILS FOR ACCESSIBILITY IN
 BATHROOMS, DRINKING FOUNTAIN AND CLASSROOM SINKS. PER
 FBC ACC CHAPTER 6
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved