| Plan Review Notes For Permit 17030415 |
| Permit Number |
17030415 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2017-03-11 07:38:14 | 1) SUBMIT CALCULATIONS FOR COMBUSTION AIR.COMPLY WITH | | | 2014 FBC-FUEL GAS SEC.304.1. | | | 2) A CSA INTERNATIONAL DESIGN CERTIFIED DOWN DRAFT | | | DIVERTER MUST BE INSTALLED AT THE FLUE OUTLET OF THE | | | OVEN AND CONNECTED TO THE OUTSIDE FLUE PER THE | | | MANUFACTURER'S INSTALLATION MANUAL, PAGE 6 OF 44. | | | 3) PAGE 6 OF THE MANUFACTURER'S MANUAL STATES THAT | | | ELECTRICITY IS REQUIRED. A SEPARATE PERMIT WILL BE | | | REQUIRED FOR THE ELECTRIC. WPB AMEND. TO FBC SEC,105.1. | | | 4) TYPE "B" VENTS SHALL BE LISTED AND LABELED AND | | | TESTED IN ACCORDANCE WITH UL 441. | | | 5) SUBMIT A DETAIL AS TO HOW THE WALL PENETRATION FOR | | | THE VENT WILL BE MADE WATERTIGHT.WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | 6) SUBMIT AN ANCHORING DETAIL FOR THE GAS VENT. 2014 | | | FBC-FUEL GAS SEC. 502.6. | | | 7) THE VENT TERMINUS SHALL BE EQUIPPED WITH A LISTED | | | CAP/ LISTED ROOF ASSEMBLY. 2014 FBC-FUEL GAS | | | SEC.503.6.6. | | | 8) INDICATE THE VENTED APPLIANCE CATEGORY FOR THIS | | | APPLIANCE. THIS INFORMATION SHOULD BE OBTAINABLE FROM | | | THE MANUFACTURER.THIS INFO WILL BE BENEFICIAL FOR THE | | | REVIEW.WPB AMEND. TO FBC SEC.107.2.1. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | |
|