Plan Review Notes
Plan Review Notes For Permit 17030415
Permit Number 17030415
Review Stop G
Sequence Number 1
Notes
Date Text
2017-03-11 07:38:141) SUBMIT CALCULATIONS FOR COMBUSTION AIR.COMPLY WITH
 2014 FBC-FUEL GAS SEC.304.1.
 2) A CSA INTERNATIONAL DESIGN CERTIFIED DOWN DRAFT
 DIVERTER MUST BE INSTALLED AT THE FLUE OUTLET OF THE
 OVEN AND CONNECTED TO THE OUTSIDE FLUE PER THE
 MANUFACTURER'S INSTALLATION MANUAL, PAGE 6 OF 44.
 3) PAGE 6 OF THE MANUFACTURER'S MANUAL STATES THAT
 ELECTRICITY IS REQUIRED. A SEPARATE PERMIT WILL BE
 REQUIRED FOR THE ELECTRIC. WPB AMEND. TO FBC SEC,105.1.
 4) TYPE "B" VENTS SHALL BE LISTED AND LABELED AND
 TESTED IN ACCORDANCE WITH UL 441.
 5) SUBMIT A DETAIL AS TO HOW THE WALL PENETRATION FOR
 THE VENT WILL BE MADE WATERTIGHT.WPB AMEND. TO FBC SEC.
 107.2.1.
 6) SUBMIT AN ANCHORING DETAIL FOR THE GAS VENT. 2014
 FBC-FUEL GAS SEC. 502.6.
 7) THE VENT TERMINUS SHALL BE EQUIPPED WITH A LISTED
 CAP/ LISTED ROOF ASSEMBLY. 2014 FBC-FUEL GAS
 SEC.503.6.6.
 8) INDICATE THE VENTED APPLIANCE CATEGORY FOR THIS
 APPLIANCE. THIS INFORMATION SHOULD BE OBTAINABLE FROM
 THE MANUFACTURER.THIS INFO WILL BE BENEFICIAL FOR THE
 REVIEW.WPB AMEND. TO FBC SEC.107.2.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved