| Plan Review Notes For Permit 17021210 |
| Permit Number |
17021210 |
|
| Review Stop |
FIRE |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2017-03-01 16:34:51 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | | | | 1) TEST TO WORKING PRESSURE FOR 2 HOURS PER NFPA 13, | | | ENSURE A PRESSURE GAUGE IS LOCATED TO ENSURE ACCURATE | | | PRESSURE ON THE SYSTEM TEST. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|