| Date |
Text |
| 2017-03-10 12:00:11 | 2ND REVIEW FBC-2014 MECHANICAL |
| | PERMIT #17021161 |
| | 3/10/17 |
| | |
| | 1) THE PLAN SHEETS FOR THE 1ST AND 2ND FLOOR ARE BOTH |
| | LABELED M.1. PLEASE LABEL THE 2ND FLOOR PLAN SHEET M.2- |
| | SECTION 107.2.1 WPB AMENDMENTS TO THE FBC. |
| | |
| | 2) BOTH AC SYSTEMS FOR THE 1ST AND 2ND FLOOR ARE |
| | DESIGNATED AS SYSTEM #1 IN THE SCHEDULE. PLEASE LABEL |
| | THE 2ND FLOOR SYSTEM AS SYSTEM #2. |
| | |
| | 3) PLEASE INDICATE WHICH SETS OF AC CALCULATIONS ARE |
| | FOR SYSTEM #1 AND FOR AC #2. |
| | |
| | 4) AS PREVIOSUSLY REQUESTED IN THE 1ST REVIEW SUBMIT |
| | ENERGY CALCULATIONS- SEE SECTION R101.2 AND R101.5,1.1 |
| | FBC-14 ENERGY CONSERVATION |
| | |
| | 5) AS PREVIOUSLY REQUESTED PROVIDE CONDENSATE DISPOSAL |
| | PLANS FOR THE AIR HANDLERS- SECTION M1411.3 & M1411.3.1 |
| | FBC-14 RESIDENTIAL. |
| | |
| | 6) THE NEW 2ND FLOOR AC PLAN APPEARS TO INDICATE AHU-2 |
| | IS IN THE ATTIC. PLEASE REFER TO SECTION R403.2.4 FBC-1 |
| | ENERGY CONSERVATION AND SHOW COMPLIAINCE WITH ITEMS |
| | #1-4, AND BY SUBMITTING DOCUMENTATION OF |
| | PERFORMANCE-BASED ENERGY CONSERVATION COMPLIANCE IN |
| | ACCORDANCE WITH SECTION R405. |
| | |
| | 7) REFER TO SECTION 607.6.2.1 AND PROVIDE CEILING |
| | RADIATION DAMPERS FOR THE DUCTS PENETRATING THE |
| | FIRE-RATED FLOOR/CEILING ASSEMBLY. THE DAMPER SPECS |
| | SUBMITTED INDICATE THAT THE PRODUCT IS FOR USE IN |
| | MASONRY OR STUD WALLS, AND CONCRETE FLOORS. THE FLOOR |
| | ASSEMBLY IS WOOD. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |