2017-07-11 16:51:551ST REVIEW: FBC 2014 5TH EDITION
  
 PLUMBING COMMENTS:
  
  
 1) THE SUBMITTAL FOR, THE FUEL PIPING, AND DISPENSERS
 DO NOT MATCH THE PRODUCTS CALLED OUT ON SHEETS G-1.0 &
 G-2.0. PLEASE PROVIDE SUBMITTAL THAT MATCH OR CORRECT
 THE PLANS. ALL SUBMITTAL SHALL BEAR THE SHOP DRAWING
 APPROVAL STAMP AND SIGNATURE BY THE ENGINEER OF RECORD.
  
 2) SHEET G-1.0: THE PLANS INDICATE TWO10K GALLON FUEL
 TANKS TO REMAIN, HOWEVER THE SUBMITTED CONTRACT
 INDICATES TWO 15K GALLON TANKS TO BE INSTALLED- A
 DIFFERENT CONTRACT THAT WAS SUBMITTED SHOWS ONLY THE 1
 6000GAL TANK BEING INSTALLED PLEASE CLARIFY THE SCOPE
 OF THE PROJECT.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved