| Date |
Text |
| 2017-05-08 12:27:23 | 1) SHT. FP-1 STATES THAT THE SYSTEM WILL NOT BE |
| | PRESSURIZED PER NFPA 13D SEC. 4.2.CLARIFY. 2ND REQUEST. |
| | 2) SHT. FP-1- NOTE #14 STATES THE FLOW TEST WAS |
| | PERFORMED BY THE CITY OF PEMBROKE PINES. CLARIFY. 2ND |
| | REQUEST |
| | 3) SHT. FP-1 - THE LOCATION NOTED IN THE LOWER LEFT |
| | HAND CORNER UNDER "FLOW TEST INFO" LISTS THE NAME OF |
| | THIS PROJECT AS PELICAN GRAND BEACH RESORT. CLARIFY. |
| | THE NAME OF THIS PROJECT IS PARK SLOPE. ONE SET STILL |
| | READS "PELICAN GRAND BEACH RESORT." 2ND REQUEST |
| | 4) UNIT "A" CALCULATIONS DO NOT HAVE THE LOCATION OF |
| | THE JOB ON THEM AND THE UNIT "B" CALCULATIONS HAVE THE |
| | LOCATION NOTED AS LANTANA. CLARIFY. 2ND REQUEST. |
| | 5) SUBMIT THE MANUFACTURER'S SPECIFICATION SHEETS FOR |
| | ALL TYPES OF SPRINKLER HEADS.WPB AMEND. TO FBC SEC. |
| | 107.2.1. 2ND REQUEST. |
| | 6) SUBMIT THE MANUFACTURER'S |
| | SPECIFICATIONS/INSTALLATION INSTRUCTIONS FOR THE AMES |
| | 200B BACKFLOW PREVENTER. 2ND REQUEST. |
| | 7) CLEARLY SHOW COMPLIANCE WITH NFPA 13D SEC.7.1.1 OR |
| | 7.1.2 FOR THE REQUIRED CONTROL VALVE. 2ND REQUEST. |
| | 8) SUBMIT DOCUMENTATION THAT THE SPRINKLER HEAD |
| | DISCHARGE COMPLIES WITH NFPA 13D SEC.8.1.1.1.1, |
| | 8.1.1.1.2 OR 8.1.1.2. 2ND REQUEST. |
| | 9) SUBMIT AN ENLARGED PLAN SHOWING THE DESIGN AREA FOR |
| | UNIT B. 2ND REQUEST. |
| | 10) THE BACKFLOW PREVENTERS SHALL BE LEAD FREE PER FPC |
| | 605.2 7 CITY OF WPB CROSS-CONNECTION CONTROL MANUAL. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |