| 2017-04-15 08:45:16 | 1) SHT. FP-1 STATES THAT THE SYSTEM WILL NOT BE |
| | PRESSURIZED PER NFPA 13D SEC. 4.2.CLARIFY. |
| | 2) SHT. FP-1- NOTE #14 STATES THE FLOW TEST WAS |
| | PERFORMED BY THE CITY OF PEMBROKE PINES. CLARIFY. |
| | 3) SHT. FP-1 - THE LOCATION NOTED IN THE LOWER LEFT |
| | HAND CORNER UNDER "FLOW TEST INFO" LISTS THE NAME OF |
| | THIS PROJECT AS PELICAN GRAND BEACH RESORT. CLARIFY. |
| | THE NAME OF THIS PROJECT IS PARK SLOPE. |
| | 4) UNIT "A" CALCULATIONS DO NOT HAVE THE LOCATION OF |
| | THE JOB ON THEM AND THE UNIT "B" CALCULATIONS HAVE THE |
| | LOCATION NOTED AS LANTANA. CLARIFY. |
| | 5) THE LOCATION OF THE PROJECT ON THE PLANS IS LISTED |
| | AS LANTANA. CORRECT THE LOCATION ON THE PLANS TO WEST |
| | PALM BEACH. ALSO, ENSURE THE LOCATION & ADDRESS ON THE |
| | PERMIT APPLICATION MATCHES THE ADDRESS ON THE PLANS. |
| | WPB AMEND. TO FBC SEC. 107.2.1. |
| | 6) SUBMIT THE MANUFACTURER'S SPECIFICATION SHEETS FOR |
| | ALL TYPES OF SPRINKLER HEADS.WWPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | 7) SHT. FP-4 - CLARIFY THE CONNECTION OF THE FIRE |
| | SPRINKLER SYSTEM TO THE DOMESTIC WATER SYSTEM. THE |
| | ISOMETRIC IS VAGUE AND CONFUSING.WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | 8) SUBMIT THE MANUFACTURER'S |
| | SPECIFICATIONS/INSTALLATION INSTRUCTIONS FOR THE AMES |
| | 200B BACKFLOW PREVENTER. |
| | 9) CLEARLY SHOW COMPLIANCE WITH NFPA 13D SEC.7.1.1 OR |
| | 7.1.2 FOR THE REQUIRED CONTROL VALVE. |
| | 10) SUBMIT DOCUMENTATION THAT THE SPRINKLER HEAD |
| | DISCHARGE COMPLIES WITH NFPA 13D SEC.8.1.1.1.1, |
| | 8.1.1.1.2 OR 8.1.1.2. |
| | 11) SUBMIT AN ENLARGED PLAN SHOWING THE DESIGN AREA FOR |
| | UNIT B. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |