| Date |
Text |
| 2017-03-17 09:22:30 | GAS COMMENTS: |
| | |
| | 1. SHOW COMPLIANCE WITH FBC FUEL GAS 404.8.2 CONDUIT |
| | WITH BOTH ENDS TERMINATING INDOORS. |
| | WHERE THE CONDUIT ORIGINATES AND TERMINATES WITHIN THE |
| | SAME BUILDING, THE CONDUIT SHALL ORIGINATE AND |
| | TERMINATE IN AN ACCESSIBLE PORTION OF THE BUILDING AND |
| | SHALL NOT BE SEALED. THE CONDUIT SHALL EXTEND NOT LESS |
| | THAN 2 INCHES (51 MM) BEYOND THE POINT WHERE THE PIPE |
| | EMERGES FROM THE FLOOR. |
| | |
| | 2, SHOW ROUTING FROM METER TO STEP DOWN REGULATOR NOT |
| | SHOWN ON SITE PLAN. PER WPB AMEND TO FBC 107,2,1 |
| | |
| | 3. TYPE OF GAS, (LP OR NATURAL). |
| | |
| | 4. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE |
| | FBC-2014 FUEL GAS CODE SEC. 304. |
| | |
| | 5. INDICATE THE DELIVERY PRESSURE (PSI) PER FBC-2014 |
| | FUEL GAS SEC. 402.2. IF NATURAL GAS SPECIFY .5 PSI OR 2 |
| | PSI. |
| | |
| | 6. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND |
| | TERMINATION OF THE GAS VENTS PER FBC-2014 FUEL GAS CODE |
| | SEC. 502 THRU 505. |
| | |
| | 7. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL |
| | GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA |
| | 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2 |
| | |
| | |
| | 1ST REVIEW |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER LL |
| | CITY OF WEST PALM BEACH |
| | DEVELOPMENT SERVICES |
| | BUILDING DIVISION |
| | 561-805-6711 |
| | [email protected] |
| | |
| | |
| | |
| | DUE TO THE DEFICIENCIES OF THIS PLAN A COMPLETE AND |
| | THOROUGH REVIEW CANNOT BE DONE AT THIS TIME. UPON |
| | RESUBMITTAL THERE MAYBE ADDITIONAL COMMENTS. |
| | |
| | WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES |
| | AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE |
| | AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW. |
| | |