| Plan Review Notes For Permit 17020540 |
| Permit Number |
17020540 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2017-02-16 07:31:22 | 1) IDENTIFY ON THE COLLECTOR SPECIFICATION SHEET WHICH | | | COLLECTOR MODEL IS BEING INSTALLED. WPB AMEND. TO FBC | | | SEC. 107.2.1. | | | 2) SUBMIT TWO CCOPIES OF THE CURRENT SRCC/FSEC | | | CERTIFICATION FOR THE COLLECTOR BEING INSTALLED.WPB | | | AMEND. TO FBC SEC. 107.2.1. | | | 3) NOTE #6 ON THE DRAWING BY J.TORRES, ENGINEER, REFERS | | | TO ECOSPARK INSTALLATION MANUAL.PLEASE SUBMIT TWO | | | COPIES OF THIS MANUAL FOR REVIEW AND AS PART OF THIS | | | PERRMIT. | | | 4) SUBMIT A PIPING DIAGRAM FOR THE PIPING TO BE | | | INSTALLED.WPB AMEND. TO FBC SEC. 107.2.1. | | | 5) WILL THERE BE A CONNECTION TO POTABLE WATER? IF SO, | | | A BACKFLOW PREVENTER MAY REQUIRED TO ISOLATE THE | | | HAZARD. 2014 FBC-PLUMBING SECS.608.1, 608.13. | | | 6) THE SYSTEM SHALL COMPLY WITH 2014 FBC-MECHANICAL | | | SEC.1402.5.1 (PRESSURE & TEMPERATURE RELIEF VALVE). | | | 7) A VACUUM RELIEF MAY BE REQUIRED ON THE SYSTEM. 2014 | | | FBC-MECH. SEC.1402.5.2. CLARIFY. | | | 8) SHOW HOW PROTECTION FROM FREEZING WILL BE SUPPLIED. | | | 2014 FBC-MECH. SEC.1402.5.3. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|