| 2017-02-14 09:21:39 | 1ST REVIEW FBC-2014 MECHANICAL |
| | PERMIT #17020366 |
| | 2/14/17 |
| | |
| | 1) SHEET M1.01: THE SUMMARY "WHOLE SYSTEM HEAT LOADS" |
| | ARE INCOMPLETE- SEE SECTION C403.2.1 FBC-14 ENERGY |
| | CONSERVATION AND PROVIDE CALCULATIONS IN ACCORDANCE |
| | WITH ASHRAE/ACCA STANDARD 183 OR ACCA MANUAL N. SUMMARY |
| | CALCULATIONS PER THE EXCEPTION MUST INCLUDE ITEMS 1-13, |
| | BE PERFORMED FOR EACH ZONE, AND BE SUBMITTED ON A |
| | SIGNED AND SEALED SUMMARY SHEET. |
| | |
| | 2) M1.01: PLEASE BREAKDOWN THE VENTILATION CALCULATIONS |
| | FOR THE BEAUTY/NAIL SALON TO PROVIDE 50 CFM PER NAIL |
| | TABLE AND 0.60 CFMS PER SF FOR THE SALON. THE CURRENT |
| | PLAN APPEARS TO BE NON-COMPLIANT WITH ONLY THE EF-1 |
| | FUNCTIONING IN THE AREA. |
| | |
| | 3) M1.01 & M1.02: THE PLAN INDICATES AIR IN THE BEAUTY |
| | SALON IS BEING RECIRCULATED INTO OTHER ROOMS AND SPACES |
| | WHICH IS PROHIBITED PER TABLE 403.3 FOOTNOTE B- PLEASE |
| | CORRECT. |
| | |
| | 4) M1.01: EXHAUST VENTILATION IS REQUIRED FOR THE |
| | SHOWER- SEE TABLE 403.3 AND PROVIDE A SYSTEM. |
| | |
| | 5) M1.01: INDICATE HOW OUTSIDE AIR IS BEING SUPPLIED TO |
| | AHU-1. |
| | |
| | 6) M1.02: CLARIFY THE PURPOSE OF EF-1 IN THE WALL BY |
| | THE ELEVATOR AND INDICATE HOW THE FAN WAS SIZED- |
| | PROVIDE A CALCULATION. |
| | |
| | 7) PLEASE CLARIFY WHAT TYPE OF "TREATMENT" IS PERFORMED |
| | IN THE VARIOUS ROOMS SHOWN ON THE PLAN SO A COMPLETE |
| | MECHANICAL REVIEW CAN BE ACCOMPLISHED. |
| | |
| | 8) PROVIDE AN AIR BALANCE CALCULATION. |
| | |
| | 9) PROVIDE CHILLED WATER AND CONDENSATE PIPING DETAILS- |
| | TYPE OF PIPING, TYPE OF INSULATION AND INSULATION |
| | THICKNESSES, |
| | |