| Plan Review Notes For Permit 17020365 |
| Permit Number |
17020365 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2017-02-14 05:08:24 | 1) SHOW THE APPROXIMATE BTU LOAD FOR THE FUTURE POOL | | | HEATER TO ENSURE THAT THE SYSTEM IS SIZED CORRECTLY . A | | | COMPREHENSIVE REVIEW CANNOT BE DONE WITHOUT IT.2014 FGC | | | SEC.402.2. | | | 2) THE LINE FOR THE FUTURE POOL HEATER SHALL BE | | | EQUIPPED WITH A SHUTOFF VALVE, REGULATOR, NIPPLE AND | | | CAP TO ENSURE THE SAFETY AND INTEGRITY OF THE SYSTEM. | | | 3) SHOW THE TYPE OF PIPE AND THE SIZE OF THE STUB OUT | | | PIPING COMING OFF THE STEP-DOWN REGULATOR ALL | | | APPLIANCES. | | | 4) SHOW THE CORRESPONDING EHD FOR THE CSST ON THE PLAN. | | | COMPLY WITH TABLE 402.4 (15). | | | 5) SHOW THE DISTANCE OF THE TANKLESS WATER HEATERS FROM | | | OPERABLE DOORS AND WINDOWS ON THE SITE PLAN. THE | | | TANKLESS WATER HEATERS SHALL BE LOCATED IN ACCORDANCE | | | WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. | | | | | | NOTE: FOR ALL GAS PERMITS: IF COMBUSTION AIR | | | CALCULATIONS ARE REQUIRED THEY SHALL BE SUBMITTED ALONG | | | WITH THE OTHER PERMIT DOCUMENTS AT THE TIME OF PERMIT | | | APPLICATION SUBMITTAL. THE GAS INSTALLATION SHALL MEET | | | ALL THE REQUIREMENTS OF THE FUEL GAS CODE AND THIS | | | INCLUDES COMBUSTION AIR CALCULATIONS. THE NOTE ON THE | | | PLANS THAT READS " MAKE-UP AIR BY OTHERS" WILL RESULT | | | IN A FAILED PLAN REVIEW IF COMBUSTION AIR CALCULATIONS | | | ARE REQUIRED AND NOT SUBMITTED. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|