| Date |
Text |
| 2017-03-30 09:47:10 | FAILED |
| | |
| | PROVIDE WRITTEN RESPONSES. |
| | |
| | 1) REPEAT UPDATED COMMENT: THE FOLLOWING PLANS DO NOT |
| | SHOW THE SAME FIRST FLOOR CONDITIONS - ARCHITECTURAL |
| | SITE PLAN (SHEETS A0.5 AND A1.0) THE LIFE SAFETY PLAN |
| | (SHEET A0.5), PARTIAL FIRST FLOOR PLANS (SHEETS A1.1 |
| | AND A1.2), THE SITE PLAN (SP-1), CIVIL PLAN (SHEET 2 OF |
| | 7), SOUTH AND EAST ELEVATIONS (SHEETS A4.1 AND S1.9), |
| | PARTIAL 1ST FLOOR ELECTRICAL PLAN (SHEET E1.2), PARTIAL |
| | 1ST FLOOR FIRE PROTECTION PLAN (SHEET FP1.1), |
| | STRUCTURAL PLANS (SHEETS S1.0 AND S1.1) - EX. DOOR |
| | PLACEMENT FOR THE SPRINKLER ROOM (FROM THE FRONT TO THE |
| | SIDE) AND ELECTRIC ROOM (FROM INSIDE TO OUTSIDE) AND |
| | NEW DOOR ON SOUTH ELEVATION OF LIFE SAFETY PLAN BY THE |
| | RETAIL BAY. ALL PLANS SHALL SHOW THE SAME CONDITIONS. |
| | THE ARCHITECTURAL, ELECTRICAL, STRUCTURAL AND FIRE |
| | PROTECTION PLANS (AND ANY OTHER PLANS WHICH DO NOT |
| | MATCH) SHALL BE CORRECTED PRIOR TO ZONING APPROVAL OF |
| | THIS BUILDING PERMIT. THE SITE AND CIVIL PLANS SHALL BE |
| | CORRECTED PRIOR TO C.O. (SEE COMMENT NO. 4 BELOW). |
| | |
| | 2) WHY ARE THERE TWO ARCHITECTURAL SITE PLANS, WHICH |
| | APPEAR THE SAME, WITH TWO DIFFERENT SHEET NUMBERS? WHY |
| | DOES THE LIFE SAFETY PLAN HAVE THE SAME SHEET NUMBER AS |
| | ONE OF THE ARCHITECTURAL SITE PLANS? |
| | |
| | 3) THE FIRST FLOOR ELECTRICAL SITE PLANS SHOW HEAT |
| | PUMPS (HP-5 AND HP-7) ON THE SOUTH SIDE OF THE |
| | BUILDING. MECHANICAL EQUIPMENT IS NOT PERMITTED BETWEEN |
| | THE BUILDING AND CONGRESS AVENUE. SHEET M1.1 CORRECTLY |
| | SHOWS BOTH OF THESE UNITS TO THE REAR OF THE BUILDING. |
| | |
| | 4) AS STATED IN COMMENT NO. 1 ABOVE, THERE ARE DOORS |
| | SHOWN ON VARIOUS PLANS IN NEW LOCATIONS AND THERE ARE |
| | MORE HEAT PUMPS (MECHANICAL EQUIPMENT) SHOWN ALONG THE |
| | REAR OF THE BUILDING AS COMPARED TO THE SITE, |
| | LANDSCAPE, ELEVATION AND CIVIL PLANS APPROVED AS PART |
| | OF THE PLANNING APPROVAL PROCESS. SINCE THESE PLANS |
| | HAVE CHANGED, PRIOR TO C.O. OF THIS BUILDING, AN AS |
| | BUILT MINOR AMENDMENT IS REQUIRED TO BE SUBMITTED TO |
| | THE PLANNING DIVISION. |
| | |
| | 5) REPEAT COMMENT: IN ACCORDANCE WITH RESOLUTION NO. |
| | 201-16, WHICH APPROVED THIS SITE DEVELOPMENT, PRIOR TO |
| | ZONING APPROVAL OF THIS BUILDING PERMIT PROVIDE THE |
| | PLANNING DIVISION WITH A COPY OF THE APPROVED DRIVEWAY |
| | CONNECTION PERMIT FROM PALM BEACH COUNTY ENGINEERING |
| | FOR THE DRIVEWAY CONNECTIONS TO NORTH CONGRESS AVENUE. |
| | |
| | 6) SEPARATE PERMITS, WITH PLANS, ARE REQUIRED FOR THE |
| | FOLLOWING: |
| | |
| | A. SIGNAGE |
| | B. LANDSCAPE |
| | C. IRRIGATION |
| | D. SITE LIGHTING |
| | E. PARKING LOT STRIPING |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446 |
| | [email protected] |
| | |