| Date |
Text |
| 2017-03-24 10:36:24 | 2ND REVIEW FBC-2014 MECHANICAL |
| | PERMIT #17011176 |
| | 3/24/17 |
| | |
| | 1) IN RESPONSE TO COMMENT #1 FROM THE 1ST REVIEW |
| | REQUESTING DOCUMENTATION OF ENERGY CONSERVATION |
| | COMPLIANCE, AN OUTDATED ENERGYGAUGE FORM 506-2010 HAS |
| | BEEN SUBMITTED. PLEASE SEE SECTION C101.5.1 FBC-14 |
| | ENERGY CONSERVATION AND SUBMIT AN UP-TO-DATE COMPLIANCE |
| | FORM. |
| | |
| | 2) THE REQUESTED AC COOLING AND HEATING CALCULATIONS |
| | WERE NOT SUBMITTED- PLEASE COMPLY. |
| | |
| | 3) AS REQUESTED IN THE 1ST REVIEW, PLEASE SUBMIT TWO |
| | COPIES OF THE MIAMI-DADE NOA #16-0112.02 FOR THE |
| | LOUVER. |
| | |
| | 4) REFER TO SECTION C408.2 FBC-14 ENERGY CONSERVATION- |
| | AC SYSTEM COMMISSIONING IS REQUIRED. |
| | |
| | C408.2 MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION |
| | REQUIREMENTS. |
| | PRIOR TO PASSING THE FINAL MECHANICAL INSPECTION, THE |
| | REGISTERED DESIGN PROFESSIONAL SHALL PROVIDE EVIDENCE |
| | OF MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION IN |
| | ACCORDANCE THE PROVISIONS OF THIS SECTION. |
| | CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE |
| | PROVISIONS FOR COMMISSIONING AND COMPLETION |
| | REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE |
| | PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER |
| | REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE |
| | GIVEN TO THE OWNER AND MADE AVAILABLE TO THE CODE |
| | OFFICIAL UPON REQUEST IN ACCORDANCE WITH SECTIONS |
| | C408.2.4 AND C408.2.5. |
| | |
| | 2A) C408.2.1 COMMISSIONING PLAN. |
| | A COMMISSIONING PLAN SHALL BE DEVELOPED BY A REGISTERED |
| | DESIGN PROFESSIONAL OR APPROVED AGENCY AND SHALL |
| | INCLUDE THE FOLLOWING ITEMS: |
| | |
| | 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL |
| | BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING, |
| | INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF |
| | THE ACTIVITIES. |
| | 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR |
| | SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO |
| | BE PERFORMED. |
| | 3. FUNCTIONS TO BE TESTED, INCLUDING, BUT NOT LIMITED |
| | TO CALIBRATIONS AND ECONOMIZER CONTROLS. |
| | 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED. |
| | AT A MINIMUM, TESTING SHALL AFFIRM WINTER AND SUMMER |
| | DESIGN CONDITIONS AND FULL OUTSIDE AIR CONDITIONS. |
| | 5. MEASURABLE CRITERIA FOR PERFORMANCE. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |