| 2017-02-11 08:00:50 | 1) SHT. P-4.05 - THE INFORMATION BOXES FOR THE MEDIUM | | | PRESSURE GAS SYSTEM SHOW TWO DIFFERENT TOTAL BTU LOAD | | | VALUES FOR THE MEDIUM PRESSURE GAS SYSTEMS. TTHE BTU | | | LOADS SHOULD BE THE SAME. CLARIFY.2010 FBC-FUEL GAS | | | SEC. 402.2. | | | 2) SHT.P-4.05 - THE INFORMATION BOXES FOR THE MEDIUM | | | PRESSURE GAS SYSTEMS SHOW DIFFERENT PIPE DEVELOPED | | | LENGTH MEASUREMENTS. THESE MEASUREMENTS SHOULD BE THE | | | SAME. CLARIFY. 2010 FBC- FUEL GAS SEC.402.4.1. | | | 3) SHT. P-4.05 - THE INFORMATION BOX FOR THE GAS SYSTEM | | | SHOWING 4,650,000 BTU'S REFERS TO A 2 PSI SYSTEM BUT | | | THE NOTE UNDER THIS SAME BOX REFERS TO TABLE 402.4 (2) | | | WHICH IS FOR A LESS THAN 2 PSI SYSTEM. CLARIFY. | | | 4) SHT. P-4.06 - THE GAS ISOMETRIC SHOWS A 5 INCH | | | SUPPLY LINE ON THE DISCHARGE SIDE OF THE METER AND THE | | | LINE IS ALSO SHOWN AS 2 INCHES IN DIAMETER. CLARIFY. | | | 5) SHT. P- 4.07 - SIZE THE WATER SUPPLY LINE TO THE | | | HOSE BIBBS IN THE CORRIDOR SHOWN IN THE CLOUDED RISER. | | | PLEASE SUPPLY THE RISER WITH A TAG NUMBER FOR | | | IDENTIFICATION. THE SAME APPLIES TO SHT. P-4.11. | | | 6) SHT.P-4.10 - THE INFORMATION BOXES FOR THE MEDIUM | | | PRESSURE GAS SYSTEMS SHOW DIFFERENT PIPE DEVELOPED | | | LENGTH MEASUREMENTS.THESE MEASUREMENTS SHOULD BE THE | | | SAME. CLARIFY. 2010 FBC-FUEL GAS SEC.402.4.1. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | |
|