Plan Review Notes
Plan Review Notes For Permit 17010960
Permit Number 17010960
Review Stop P
Sequence Number 1
Notes
Date Text
2017-02-11 08:00:501) SHT. P-4.05 - THE INFORMATION BOXES FOR THE MEDIUM
 PRESSURE GAS SYSTEM SHOW TWO DIFFERENT TOTAL BTU LOAD
 VALUES FOR THE MEDIUM PRESSURE GAS SYSTEMS. TTHE BTU
 LOADS SHOULD BE THE SAME. CLARIFY.2010 FBC-FUEL GAS
 SEC. 402.2.
 2) SHT.P-4.05 - THE INFORMATION BOXES FOR THE MEDIUM
 PRESSURE GAS SYSTEMS SHOW DIFFERENT PIPE DEVELOPED
 LENGTH MEASUREMENTS. THESE MEASUREMENTS SHOULD BE THE
 SAME. CLARIFY. 2010 FBC- FUEL GAS SEC.402.4.1.
 3) SHT. P-4.05 - THE INFORMATION BOX FOR THE GAS SYSTEM
 SHOWING 4,650,000 BTU'S REFERS TO A 2 PSI SYSTEM BUT
 THE NOTE UNDER THIS SAME BOX REFERS TO TABLE 402.4 (2)
 WHICH IS FOR A LESS THAN 2 PSI SYSTEM. CLARIFY.
 4) SHT. P-4.06 - THE GAS ISOMETRIC SHOWS A 5 INCH
 SUPPLY LINE ON THE DISCHARGE SIDE OF THE METER AND THE
 LINE IS ALSO SHOWN AS 2 INCHES IN DIAMETER. CLARIFY.
 5) SHT. P- 4.07 - SIZE THE WATER SUPPLY LINE TO THE
 HOSE BIBBS IN THE CORRIDOR SHOWN IN THE CLOUDED RISER.
 PLEASE SUPPLY THE RISER WITH A TAG NUMBER FOR
 IDENTIFICATION. THE SAME APPLIES TO SHT. P-4.11.
 6) SHT.P-4.10 - THE INFORMATION BOXES FOR THE MEDIUM
 PRESSURE GAS SYSTEMS SHOW DIFFERENT PIPE DEVELOPED
 LENGTH MEASUREMENTS.THESE MEASUREMENTS SHOULD BE THE
 SAME. CLARIFY. 2010 FBC-FUEL GAS SEC.402.4.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  