| Date |
Text |
| 2017-04-10 13:43:41 | 1) THE LETTER THAT WAS SUBMITTED FROM GLIDDEN SPINA |
| | PARTNERS FOR THE OCCUPANT LOAD FOR THE REQUIRED |
| | SANITARY FACILITIES IS UNACCEPTABLE. THE NON-ASSEMBLY |
| | ROOM NUMBERS ARE LACKING THE CORRESPONDING SQUARE |
| | FOOTAGE OF EACH ROOM IN ORDER TO CONFIRM THE NEW |
| | OCCUPANT LOAD. WITHOUT THIS INFORMATION I CANNOT |
| | DETERMINE THE MINIMUM REQUIRED SANITARY FACILITIES AND |
| | THIS FACILITY SHALL COMPLY WITH THE POTTY PARITY |
| | REQUIREMENTS AS MANDATED IN THE 2014 FBC-PLUMBING |
| | SEC.403.1.3. I DISCUSSED THIS ITEM IN LENGTH WITH THE |
| | REPRESENTATIVE FROM GLIDDEN SPINA IN A MEETING AND I |
| | PROVIDED CLEAR DIRECTION AS TO WHAT WOULD BE REQUIRED |
| | TO MEET THE EXCEPTION LISTED IN SEC. 603.1.3. THE |
| | DIRECTION THAT I PROVIDED WAS NOT FOLLOWED AND |
| | THEREFORE THE EXCEPTION HAS NOT BEEN MET. 2ND REQUEST. |
| | 2) SHT. P5.1 - THE VENT FOR THE TRENCH DRAIN LOCATED IN |
| | ROOM #111 DOES NOT COMPLY WITH 2014 FBC-PLUMBING |
| | SEC.905.3. THE VENT SHALL CONNECT TO THE HORIZONTAL |
| | DRAIN ABOVE THE CENTERLINE OF THE HORIZONTAL DRAIN |
| | PIPE. |
| | 3) THE POTABLE WATER CONNECTION TO THE BOILER SHALL BE |
| | EQUIPPED WITH A BACKFLOW PREVENTER WITH AN INTERMEDIATE |
| | VENT COMPLYING WITH ASSA 1012 OR CSA B64.3 PER FBC |
| | -PLUMBING SEC. 608.16.2. THE NOTE ON THE PLAN REFERS TO |
| | MANUFACTURER REQUIREMENTS. THIS IS A PLUMBING CODE |
| | REQUIREMENT AND THE PROPER BACKFLOW DEVICE SHALL BE |
| | PROVIDED. 2ND REQUEST. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |