| Date |
Text |
| 2017-07-05 15:27:43 | 3RD REVIEW FBC-2014 MECHANICAL |
| | PERMIT #17010872 |
| | 7/5/17 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) CLARIFY HOW ACCESS FOR SERVICE AND REPLACEMENT OF |
| | THE ABOVE CEILING AIR HANDLERS WILL BE PROVIDED- |
| | SECTION 306.1. SHOW PANEL LOCATIONS AND PROVIDE |
| | DIMENSIONS. |
| | |
| | 306.1 ACCESS FOR MAINTENANCE AND REPLACEMENT. |
| | APPLIANCES SHALL BE ACCESSIBLE FOR INSPECTION, SERVICE, |
| | REPAIR AND REPLACEMENT WITHOUT DISABLING THE FUNCTION |
| | OF A FIRE-RESISTANCE-RATED ASSEMBLY OR REMOVING |
| | PERMANENT CONSTRUCTION, OTHER APPLIANCES, VENTING |
| | SYSTEMS OR ANY OTHER PIPING OR DUCTS NOT CONNECTED TO |
| | THE APPLIANCE BEING INSPECTED, SERVICED, REPAIRED OR |
| | REPLACED. A LEVEL WORKING SPACE AT LEAST 30 INCHES DEEP |
| | AND 30 INCHES WIDE (762 MM BY 762 MM) SHALL BE PROVIDED |
| | IN FRONT OF THE CONTROL SIDE TO SERVICE AN APPLIANCE. |
| | |
| | 2) SHEET D1: PROVIDE HVAC DEMOLITION NOTES. IT APPEARS |
| | THAT THE EXISTING AIR HANDLER IN THE CORRIDOR CLOSET IS |
| | BEING REMOVED AND THE CLOSET OPENING WALLED OFF. REFER |
| | TO COMMENT #1 ABOVE AND CLARIFY HOW THE OWNER OF THE |
| | UNIT WILL GAIN ACCESS TO IT. |
| | |
| | 3) M0.1: REVISE SCOPE OF WORK #3 TO INDICATE THAT |
| | SEPARATE PERMITS ARE REQUIRED FOR THE KITCHEN EXHAUST |
| | SYSTEM AND WALK-IN COOLER. PLEASE NOTE THAT THE |
| | LOCATION OF THE GREASE HOOD EXHAUST TERMINATION AT THE |
| | SOUTH WALL MAY NOT BE IN COMPLIANCE WITH SECTION |
| | 506.3.13.2 |
| | |
| | 4) M1.1: PLEASE LABEL THE O/A INTAKE OPENING IN THE |
| | SIDEWALK AS EITHER NEW OR EXISTING. |
| | |
| | 5) M1.1: REVISE MECHANICAL PLAN KEY NOTE #1: SECTION |
| | 401.4 FBC-14 MECHANICAL REQUIRES A MINIMUM 10' |
| | CLEARANCE FROM THE O/A OPENING TO THE STREET, WHICH IS |
| | ALSO NOTED ON THE PLAN. |
| | |
| | 6) M1.1: INDICATE HOW ACCESS TO THE FIRE DAMPER IN THE |
| | FLOOR WILL BE PROVIDED- SECTION 607.4. |
| | |
| | 7) M1.1: PROVIDE WIND LOAD ENGINEERING FOR INSTALLATION |
| | OF THE NEW ROOFTOP CONDENSERS- SECTION 301.15. SEE ALSO |
| | BUILDING REVIEW COMMENTS. |
| | |
| | 8) M1.1: IT APPEARS FROM THE DRAWINGS THAT GUARDS WILL |
| | BE REQUIRED ALONG THE ROOF EDGES IN THE AREA OF THE NEW |
| | ROOFTOP CONDENSERS. PLEASE SEE SECTION 304.11 AND |
| | PROVIDE DETAILS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |