| 2017-01-26 15:24:05 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | 1. REFER TO BULLETIN #5, REVISED PAGE S102. DESIGN |
| | PRESSURES FOR ZONE 4 IS +-48PSF, ZONE 5 +48.6 / -88.8 |
| | REGARDLESS OF SIZE OF OPENING. REVISE SHEET 1 OF 11 |
| | ACCORDINGLY. |
| | |
| | 2. FS 553, FLORIDA STATE OR LOCAL PRODUCT APPROVAL IS |
| | REQUIRED. CUT SHEETS OF COPIED ENGINEERING WHICH MAY BE |
| | FROM A PRODUCT APPROVAL WERE SUBMITTED. THE CUT SHEETS |
| | LACK A PRODUCT APPROVAL NUMBER. |
| | |
| | IF A LOCAL PRODUCT APPROVAL IS REQUIRED, SEE |
| | REQUIREMENTS IN FLORIDA STATUTE, PROVIDE ORIGINAL |
| | ENGINEERING, EVALUATION REPORT, ETC. DOCUMENTS PREPARED |
| | BY AN ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO |
| | BE SIGNED, SEALED, DATED ORIGINALS. (PRODUCT APPROVALS |
| | FOR WHICH THE ORIGINAL IS ON FILE WITH THE STATE ARE |
| | EXEMPTED FROM THIS STATUTE.) |
| | |
| | 3. A NOTE ON THE PLANS STATE THAT OPERABLE DOORS ARE TO |
| | BE INSTALLED IN ZONE 4 ONLY. PLEASE ADVISE AS TO WHICH |
| | FIXED DOORS ARE PROPOSED IN ZONE 5. |
| | |
| | THE FIXED PANEL HAS A DESIGN PRESSURE LIMITATION OF +70 |
| | / -85 PSF, WHICH DOES NOT MEET THE ENGINEER OF RECORD'S |
| | DESIGN PRESSURE REQUIREMENT FOR ZONE 5. DESIGN |
| | PRESSURES FOR PRODUCTS INSTALLED IN BOTH ZONES |
| | (PARTIALLY IN ZONE 4, PARTIALLY IN ZONE 5) MAY, TO THE |
| | BEST OF MY KNOWLEDGE, BE INTERPOLATED (PLEASE CONSULT |
| | WITH EOR). |
| | |
| | 4. THE INSWING DOOR SHOWN ON SHEET 1 (1ST FLOOR H |
| | INSWING) APPEARS TO HAVE A DESIGN PRESSURE LIMITATION |
| | OF +40 / -50. IT IS POSSIBLE THAT OTHER DOORS DO NOT |
| | COMPLY WITH THE ENGINEER OF RECORD'S SPECIFIED DESIGN |
| | PRESSURES. A COMPLETE REVIEW WAS NOT DONE. IT IS |
| | SUGGESTED THAT A SCHEDULE SHOWING THE DP LIMIT FOR EACH |
| | PRODUCT BE CREATED SO COMPLIANCE CAN QUICKLY BE |
| | VERIFIED. |
| | |
| | 5. DESIGN PROFESSIONAL IS TO VERIFY THAT ALL PRODUCTS |
| | APPROVED FOR USE COMPLY WITH THE DESIGN PRESSURES FOR |
| | THE PROJECT PRIOR TO SUBMITTAL, FBC 107. |
| | |
| | |
| | |
| | |