| Plan Review Notes For Permit 17010714 |
| Permit Number |
17010714 |
|
| Review Stop |
E |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2017-01-26 15:27:13 | 1ST REVIEW 2014 5TH FBC ED. NEC 2014 | | | MARIO VALDES | | | ELECTRICAL PLAN EXAMINER | | | 561-805-6713 | | | [email protected] | | | | | | | | | 1] PV SOLAR LINE SIDE TAP EQUIPMENT GROUNDING | | | CONDUCTORS SHALL BE GROUPED TOGETHER PER NEC 690.47(F) | | | | | | 2] USING THE PV MAXIMUM SHORT CIRCUIT PLUS THE UTILITY | | | AVAILABLE FAULT CURRENT SHOW AIC CALCULATIONS TO VERIFY | | | SHORT CIRCUIT RATING OF EQUIPMENT. NEC 110.24, 110.10, | | | 110.9 | | | | | | 3] CLARIFY WHY FROM THE AC DISCONNECT TO THE AC | | | COMBINER AN 8 AWG IS BEING USED WHEN A 6 AWG IS BEING | | | USED FROM THE DISCONNECT TO THE MAIN SERVICE PANEL. (8 | | | AWG = 40 AMPS ON 60 DEGREE TERMINALS) ( AC INVERTER | | | OUTPUT CURRENT IS 21 AMPS X 125% X 2 INVERTERS = 52.5 | | | AMPS) | | | | | | 4] IN ACCORDANCE WITH NEC 705.50 INTERCONNECTED | | | ELECTRIC POWER PRODUCTION SOURCES SHALL BE GROUNDED IN | | | ACCORDANCE WITH ARTICLE 250. THEREFORE THE PV AC | | | DISCONNECT SHALL BE BONDED TO THE CASE & SERVICE RATED. |
|