Plan Review Notes
Plan Review Notes For Permit 17010714
Permit Number 17010714
Review Stop E
Sequence Number 1
Notes
Date Text
2017-01-26 15:27:131ST REVIEW 2014 5TH FBC ED. NEC 2014
 MARIO VALDES
 ELECTRICAL PLAN EXAMINER
 561-805-6713
 [email protected]
  
  
 1] PV SOLAR LINE SIDE TAP EQUIPMENT GROUNDING
 CONDUCTORS SHALL BE GROUPED TOGETHER PER NEC 690.47(F)
  
 2] USING THE PV MAXIMUM SHORT CIRCUIT PLUS THE UTILITY
 AVAILABLE FAULT CURRENT SHOW AIC CALCULATIONS TO VERIFY
 SHORT CIRCUIT RATING OF EQUIPMENT. NEC 110.24, 110.10,
 110.9
  
 3] CLARIFY WHY FROM THE AC DISCONNECT TO THE AC
 COMBINER AN 8 AWG IS BEING USED WHEN A 6 AWG IS BEING
 USED FROM THE DISCONNECT TO THE MAIN SERVICE PANEL. (8
 AWG = 40 AMPS ON 60 DEGREE TERMINALS) ( AC INVERTER
 OUTPUT CURRENT IS 21 AMPS X 125% X 2 INVERTERS = 52.5
 AMPS)
  
 4] IN ACCORDANCE WITH NEC 705.50 INTERCONNECTED
 ELECTRIC POWER PRODUCTION SOURCES SHALL BE GROUNDED IN
 ACCORDANCE WITH ARTICLE 250. THEREFORE THE PV AC
 DISCONNECT SHALL BE BONDED TO THE CASE & SERVICE RATED.