| 2017-01-30 10:18:18 | 1) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE INSTANT |
| | WATER HEATERS.WPB AMEND. TO FBC SEC. 107.2.1. |
| | 2) SHT. P-002 - WATER HEATER DETAIL - THE RELIEF LINE |
| | SHALL DISCHARGE THROUGH AN AIR GAP LOCATED IN THE SAME |
| | ROOM AS THE WATER HEATER. FBC-PLUMBING SEC.504.6 (2). |
| | 3) SHT. P-002 - FL. ADMIN. CODE RULE 64E-6.013 (7) (A) |
| | REQUIRES A MINIMUM 4" OUTLET TEE ON THE GREASE |
| | INTERCEPTOR THAT EXTENDS TO WITHIN 8 INCHES OF THE |
| | BOTTOM OF THE TANK. THE DETAIL ON THE PLANS DOES NOT |
| | SHOW THIS. SUBMIT A CURRENT COPY OF THE STATE APPROVAL |
| | FOR THIS TANK FROM THE FLORIDA DEPARTMENT OF HEALTH. |
| | 4) SHT.P-002 - PENETRATION DETAIL - THERE IS NO FLOOR |
| | PENETRATION DETAIL ON THE PLANS FOR A 3 INCH PVC PIPE. |
| | THERE IS CURRENTLY A 3 INCH PVC PIPE INSTALLED IN ROOM |
| | # 114 THAT PENETRATES THE 2ND FLOOR SLAB FOR A WATER |
| | CLOSET ON THE 2ND FLOOR IN ROOM #205. THE PVC PIPE IN |
| | THE FIELD HAS BEEN PAINTED WITH A BLACK FIRE RETARDANT |
| | PAINT. THERE ARE NO SPECIFICATIONS FOR THIS MATERIAL |
| | THAT HAS BEEN SUBMITTED TO ME FOR REVIEW NOR ARE THERE |
| | ANY DETAILS ON THE PLANS FOR THIS MATERIAL. ALSO, I |
| | HAVE NO DOCUMENTATION THAT THIS MATERIAL HAS BEEN |
| | REVIEWED AND APPROVED BY THE DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE.SUBMIT A LISTED PENETRATION DETAIL |
| | APPROVED BY THE DESIGN PROFESSIONAL OF RECORD. WPB |
| | AMEND. TO FBC SEC. 107.21, 107..3.4.2. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |