Plan Review Notes
Plan Review Notes For Permit 17010356
Permit Number 17010356
Review Stop M
Sequence Number 2
Notes
Date Text
2017-03-29 09:28:31RESIDENTIAL (R3) SECOND MECHANICAL REVISION CHECKLIST.
 CODE: FBC 5TH EDITION (2014).
  
 1- EQUIPMENT MANUFACTURER WAS CHANGED. THE SEER FOR NEW
 EQUIPMENT IS 17.5 SEER. ORIGINAL PLANS AND ENERGY
 CALCULATIONS WERE APPROVED WITH 19.50 SEER. ENGINEER OF
 RECORD WHO PERFORMED THE ENERGY CALCULATIONS NEED TO
 REVISE THE ENERGY CALCULATIONS AND EQUIPMENT SIZING
 CALCULATIONS TO REFLECT NEW EQUIPMENT. SEC. R103.2 AND
 SEC. R403.6.1 FBC-ENERGY CONSERVATION, 5TH EDITION
 (2014).
 RESPONSE: REPEAT COMMENT. MECHANICAL ENGINEER OF RECORD
 TO PROVIDE REVISED ENERGY CALCULATIONS AND COMPLETE
 EQUIPMENT SIZING CALCULATIONS.
 NOTE: PLEASE MAKE SURE ENERGY CALCULATIONS AND
 EQUIPMENT SIZING CALCULATIONS ARE PROPERLY SIGNED AND
 SEALED TO AVOID CONFLICTS/DELAYS. ALSO, OWNER TO SIGN
 THE ENERGY CALCULATIONS AT THE BOTTOM OF THE FORM.
  
 2- LIVING ROOM NEEDS TO COMPLY WITH THE BALANCED RETURN
 AIR SEC. M1602.4 FBC-RESIDENTIAL, 5TH EDITION (2014).
 RESPONSE: SPECIFY THE SIZE OF THE TRANSFER DUCT TO
 VERIFY COMPLIANCE.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved