| 2017-11-21 06:57:36 | 1) THERE ARE TWO DIFFERENT GAS DRAWINGS IN THIS |
| | SUBMITTAL. I COULD NOT PERFORM A COMPREHENSIVE PLAN |
| | REVIEW DUE TO THE FACT IT IS UNCLEAR AS TO WHAT IS |
| | BEING INSTALLED AND WHICH DRAWING IS THE CORRECT |
| | DRAWING TO REVIEW. ONE PLAN SHOWS A GAS DRYER AND THE |
| | OTHER PLAN DOES NOT. THE CONTRACTOR SHALL REVIEW ALL |
| | THE SUBMIITED PLANS AND DISCARD ALL UNEEDED PLANS AND |
| | COMBINE THE APPLICABLE DRAWINGS INTO TWO COMPLETE SETS |
| | FOR SUBMITTAL AND REVIEW. WPB AMEND. TO FBC SEC. 107.1. |
| | 2) THE GAS DRYER IN THE GARAGE SHALL BE PROTECTED FROM |
| | PHYSICAL DAMAGE PER 2014 FBC-FUEL GAS SEC. 305.5.SHOW |
| | ON THE PLAN HOW THIS BEING ACCOMPLISHED. 4TH REQUEST |
| | 3) THE INSTALLATION OF THE DRYER SHALL COMPLY WITH THE |
| | FUEL GAS CODE SEC. 305.3.4TH REQUEST. |
| | 4) THE PLAN NOTES THAT PE PIPE WILL BE USED TO SUPPLY |
| | GAS TO THE POOL HEATER BUT THE SIZING TABLE THAT WAS |
| | SUBMITTED IS FOR COPPER TUBING. SUBMIT 2 COPIES OF THE |
| | SIZING TABLE FOR PE PIPE THAT IS BEING USED. 4TH |
| | REQUEST. |
| | 5) SUBMIT TWO COMPLETE COPIES OF THE MANUFACTURER'S |
| | SPECIFICATIONS FOR THE POOL HEATER. THE POOL HEATER |
| | SHALL BE LISTED AND LABELED PER 2014 FBC SEC. 301.3. |
| | THE DOCUMENT THAT HAS BEEN SUBMITTED IS A SHEET FROM |
| | THE INTERNET AND DOES NOT SUPPLY THE REQUESTED |
| | INFORMATION. 4TH REQUEST. |
| | 6) THE POOL HEATER SHALL COMPLY WITH 2014 FBC-ENERGY |
| | SEC. R403.9.1.1.4TH REQUEST. |
| | 7) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE DRYER. |
| | YOU HAVE SUPPLIED A NUMBER OF 2496 CUBIC FEET BUT ALSO |
| | REFERENCED SEC.614.5 OF THE FUEL GAS CODE WHICH |
| | REQUIRES INSTALLATIONS EXHAUSTING MMORE THAN 200 CFM'S |
| | TO BE PROVIDED WITH MAKEUP AIR. THIS IS CONFUSING AS TO |
| | HOW YOU ARE COMPLYING. CLARIFY HOW YOU ARE COMPLYING |
| | WITH THE GAS CODE FOR COMBUSTION AIR. 4TH REQUEST. |
| | 8) SUBMIT TWO COPIES OF THE INSTALLATION MANUAL FOR THE |
| | TANKLESS WATER HEATER FOR REVIEW. THE LOCATION OF THE |
| | TANKLESS WATER HEATER SHALL COMPLY WITH THE |
| | MANUFACTURER'S INSTALLATION MANUAL.WPB AMENDMENTS TO |
| | THE FBC SEC. 107.2.1. |
| | 9) A SET OF PLANS HAS BEEN SUBMITTED THAT IS DRAWN IN |
| | PENCIL. PLANS DONE IN PENCIL ARE UNACCEPTABLE AS THE |
| | DRAWING CAN BE MODIFIED/CHANGED. |
| | 10) SHOW THE LOCATION OF THE GAS METERS ON THE PLAN |
| | DRAWING. ONE SET OF PLANS HAS THE LOCATION OF THE GAS |
| | METERS AND THE OTHER DOES NOT. I HAVE NO IDEA AS TO |
| | WHICH PLAN IS THE ONE TO BE REVIEWED. WPB AMEND. TO FBC |
| | SEC. 107.2.1. |
| | 11) SUBMIT COMPLETE MANUFACTURER'S SPECIFICATIONS FOR |
| | THE GAS DRYER. THE SPECIFICATION THAT HAS BEEN |
| | SUBMITTED IS FROM THE INTERNET AND DOES NOT SUPPLY THE |
| | REQUIRED INFORMATION. THE GAS DRYER SHALL BE LISTED AND |
| | LABELED PER THE 2014 FBC-FUEL GAS SEC.301.3. THE |
| | MANUFACTURER'S SPECIFICATIONS SHALL NOTE THE CFM'S THAT |
| | ARE BEING EXHAUSTED BY THE DRYER. |
| | 12) ONE SUBMITTED GAS DRAWING SHOWS THE BTU VALUE OF |
| | THE TANKLESS WATER HEATER AS 199,000 AND ANOTHER |
| | DRAWING SHOWS 180,000. THE SUBMITTED SPECIFICATIONS |
| | SHOW A MAXIMUM BTU LOAD OF THE SPECIFIED MODEL AS |
| | 180,000. WHAT MODEL IS BEING INSTALLED? CLARIFY. |
| | ***NOTE: THE NEXT PLAN REVIEW SUBMITTAL SHALL BE |
| | SUBJECT TO FOUR TIMES THE PLAN REVIEW FEE IN ACCORDANCE |
| | WITH FL. STATUTE 553.80 (2) (B). |
| | NO FURTHER PLAN REVIEW WILL BE DONE ON THIS PERMIT |
| | APPLICATION UNTIL THE QUALIFIER OF THE COMPANY CONTACTS |
| | THE CHIEF PLUMBING INSPECTOR AND MEETS WITH THE CHIEF |
| | PLUMBING INSPECTOR TO REVIEW AND DISCUSS THESE PLAN |
| | REVIEW COMMENTS. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |