2017-01-20 05:20:211) SUBMIT 2 COPIES OF THE FLOOR PLAN OF THE WASTE GAS
 BURNER AREA THAT CLEARLY SHOWS THE LOCATION OF THE LP
 TANK.WPB AMEND. TO FBC SEC. 107.2.1.
 2) SHEET M-ADF-39 OF THE MASTER PERMIT SHOWS THE LP
 TANK AS 300 GALLONS W.C. AND THE DOCUMENTS SUBMITTED
 NOTE A 250 GALLON W.C. TANK TO BE INSTALLED. CLARIFY.
 IF THE 250 TANK IS BEING INSTALLED SUBMIT VERIFICATION
 FROM THE ENGINEER OF RECORD THAT THIS CHANGE HAS BEEN
 REVIEWED AND APPROVED BY HIM/HER. I AM REQUESTING THIS
 STEP BECAUSE THE ORIGINAL PLANS WERE SIGNED & SEALED
 AND ANY CHANGES SHALL BE REVIEWED AND APPROVED BY THE
 ENGINEER OF RECORD.
 3) PROVIDE ENGINEERING DETAILS AS TO HOW THE
 ABOVEGROUND LP TANK WILL BE ANCHORED TO WITHSTAND THE
 ANTICIPATED WIND LOADS OF 180 MPH (V ULT) PER 2014
 FBC-BUILDING SEC.1603.1.4, 1604.1, 1609.1, 2014
 FBC-FUEL GAS CODE SEC.301.10 . SHOW THE TYPE & LENGTH
 OF ANCHORS, ANCHOR LOCATION POINTS, DIAMETER / LENGTH
 OF TIE-DOWN CABLES (IF USED), NUMBER OF TIE-DOWN CABLES
 REQD. AND CAPACITIES OF THE ANCHORS/ CABLES. ALSO,
 REFER TO NFPA 58-2011 ED. SEC. 5.2.4.3 (A) (C).
 4) SUBMIT DETAILS AS TO HOW THE ABOVEGROUND TANK WILL
 BE PROTECTED AGAINST PHYSICAL DAMAGE.
 5) IT APPEARS THAT THE PERMIT IS FOR THE TANK ONLY.
 PLEASE CONFIRM THAT THE PERMIT DOES NOT INCLUDE ANY
 PIPING.WPB AMEND. TO FBC SEC. 107.2.1. IF ANY PIPING IS
 INVOLVED, ADDITIONAL PLAN REVIEW CCOMMENTS MAY BE
 GENERATED ON THE RE-REVIEW.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved