| Date |
Text |
| 2017-01-07 03:10:57 | |
| | 1) A PLAN REVIEW COULD NOT BE PERFORMED BEACAUSE THE |
| | SIZING TABLE BEING USED IS UNKNOWN.SUBMIT TWO COPIES OF |
| | THE SIZING TABLES USED IN THE DESIGN FOR THIS GAS |
| | SYSTEM OR PLACE A NOTE ON BOTH SETS OF PLANS LISTING |
| | THE SIZING TABLES FROM THE GAS CODE THAT WERE USED IN |
| | THE DESIGN OF THIS SYSTEM. FGC SEC.402.3, FBCR SEC. G |
| | 2413.3. |
| | 2) SHOW THE TOTAL DISTANCE FROM THE POINT OF DELIVERY, |
| | (GAS METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2014 |
| | FBC-FUEL GAS SEC.402.4.1 OR 2014 FBC-RES. SEC. G |
| | 2413.3. |
| | 3) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 |
| | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. |
| | 4) SHUTOFF VALVES ARE REQUIRED IMMEDIATELY AHEAD OF |
| | EACH MP REGVULATOR. 2014 FBC - FUEL GAS SEC.409.4. |
| | |
| | NOTE : DO NOT RESUBMIT THESE PLANS UNTIL ALL OF THE |
| | PLAN REVIEW COMMENTS HAVE BEEN ADDRESSED. IF THE PLANS |
| | GET REJECTED AGAIN FOR ANY REPEAT COMMENT, A FEE OF |
| | FOUR TIMES THE AMOUNT OF THE PROPORTION ATTRIBUTED TO |
| | PLANS REVIEW SHALL BE PAID PER FL. STATUTE 553.80 (2) |
| | (B). |
| | |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |