| 2017-02-21 14:32:03 | 3RD REVIEW FBC-2014 MECHANICAL |
| | PERMIT #16120091 |
| | 2/21/17 |
| | |
| | 1) PLEASE PROVIDE AN ACCURATE DRAWING INDEX ON SHEET |
| | C-1 THAT MATCHES THE RESUBMITTED PLANS. |
| | |
| | 2) 3RD REQUEST FOR AC COOLING AND HEATING CALCULATIONS |
| | FOR THE NEW RTU. |
| | |
| | 3) THE COMPLIANCE DATA FOR THE AC SYSTEMS AS SHOWN IN |
| | THE SUBMITTED ENERGYGAUGE COMPLIANCE FORM DOES NOT |
| | MATCH THE DATA SHOWN IN THE SCHEDULES FOR COOLING AND |
| | HEATING CAPACITIES, EFFICIENCY RATINGS, AND CFM SUPPLY. |
| | PLEASE NOTE THAT HEAT IS REQUIRED FOR THE TASTING ROOM, |
| | HOWEVER THE AHU SCHEDULE DOES NOT SHOW ANY PROVIDED- |
| | SEE SECTION 309.1. |
| | |
| | 4) THE COMPLIANCE DATA FOR THE GLYCOL CHILLER SHOWN IN |
| | THE ENERGYGAUGE FORM DOES NOT MATCH THE DATA IN THE |
| | EQUIPMENT SCHEDULE. PLEASE NOTE THAT THE GLYCOL CHILLER |
| | IS A PROCESS CHILLER AND DOES NOT PROVIDE COOLING, |
| | HEATING, OR VENTILATION TO THE BUILDING. SEE SECTION |
| | 1101.2 AND VERIFY THE CHILLER HAS BEEN TESTED IN |
| | ACCORDANCE WITH UL 207, 412, 471, OR 1995. SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS TO VERIFY COMPLIANCE. |
| | |
| | 5) 3RD REQUEST FOR THE BOILER EQUIPMENT SCHEDULE. |
| | |
| | 6) SHEETS 3.3M & 3.4M: THE LOCATIONS OF THE COMBUSTION |
| | AIR DUCTS DO NOT MATCH. |
| | |
| | 7) IF ELIMINATING EF-2 AS STATED IN THE RESPONSE |
| | NARRATIVE, THEN PLEASE REMOVE IT FROM THE PLANS AND THE |
| | EQUIPMENT SCHEDULE. |
| | |
| | 8) 3RD REQUEST FOR MANUFACTURER'S SPECIFICATIONS OR |
| | CUT-SHEETS FOR THE BREWERY TANKS, KETTLES, AND OTHER |
| | ASSOCIATED EQUIPMENT. |
| | |
| | 9) THE WORKING CLEARANCES FOR THE BREWERY EQUIPMENT AS |
| | SHOWN ON SHEET 1.1A DO NOT APPEAR AQDEQUATE FOR |
| | MAINTAINING AND SERVICING THE EQUIPMENT. PLEASE SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS AND INSTALLATION |
| | INSTRUCTIONS AS PREVIOUSLY REQUESTED- SEE ALSO SECTION |
| | 306.1. |
| | |
| | 10) COMPLY WITH BUILDING COMMENTS FOR INSTALLATION OF |
| | ALL ROOFTOP MECHANICAL EQUIPMENT. |
| | |
| | 11) SHEET 3.3M: VERIFY THE LOCATION OF THE KETTLE IS A |
| | MINIMUM 10' FROM THE AIR INTAKE TO RTU-1 |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |