| 2016-12-14 17:01:35 | 1ST REVIEW FBC-2014 MECHANICAL, EXISTING BUILDING, & |
| | ENERGY CONSERVATION CODES |
| | PERMIT #16120091 |
| | 12/14/16 |
| | |
| | 1) PLACE A NOTE ON THE PLANS INDICATING SEPARATE |
| | PERMITS ARE REQUIRED FOR THE WALK-IN COOLER. |
| | |
| | 2) COMPLIANCE WITH THE FLORIDA ENERGY CONSERVATION CODE |
| | IS REQUIRED IN ACCORDANCE WITH SECTION C101.4.4. REFER |
| | TO SECTION C401.2 FOR COMPLIANCE PATHS. |
| | |
| | 3) PROVIDE AC COOLING AND HEATING CALCULATIONS FOR THE |
| | NEW RTU-1 PER SECTION C403.2.1. |
| | |
| | 4) THE O/A CALCULATION IS INCOMPLETE AND DOES NOT |
| | INCLUDE THE BREWERY AND FERMENTATION AREAS. AT 6600 |
| | TOTAL SQUARE FOOTAGE, IT APPEARS THAT THE 2859 SQUARE |
| | FOOTAGE FOR THE TASTING ROOM IS UNDERESTIMATED, AND THE |
| | TOTAL LOAD PER TABLE 403.3 SHALL BE CALCULATED AT 289. |
| | |
| | 5) THE EXISTING AHU THAT IS PROVIDING 300 CFMS OF O/A |
| | TO THE TASTING ROOM IS 1549 CFMS SHORT PER THE SCHEDULE |
| | AND THE CALCULATIONS CURRENTLY SHOWN ON THE PLAN, |
| | HOWEVER THIS AMOUNT WILL INCREASE BASED ON REVISED |
| | CALCULATIONS PER COMMENT #4 ABOVE. PLEASE NOTE THAT |
| | DEMAND CONTROLLED VENTILATION IS REQUIRED FOR THE BAR |
| | IN COMPLIANCE WITH SECTION C403.2.5.1 FBC-14 ENERGY |
| | CONSERVATION. SHOW A MEANS OF COMPLIANCE ON THE PLAN. |
| | IF CO2 SENSORS ARE TO BE USED, PROVIDE THE MAKE AND |
| | MODEL NUMBER ON THE PLANS AND SUBMIT SPECS. |
| | |
| | 6) PLEASE RE-LABEL THE CHILLER POSSIBLY USING CH-1 |
| | RATHER THAN RTU-1 WHICH IS BEING USED TO IDENTIFY THE |
| | NEW ROOFTOP UNIT. |
| | |
| | 7) PROVIDE EQUIPMENT SCHEDULES ON THE PLAN FOR THE NEW |
| | BOILER, BLOW DOWN TANK, AND FLUE VENT, AND SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS WITH SHOP DRAWING |
| | APPROVAL STAMPS BY THE EOR- SEE SECTION 631.1 FBC-14 |
| | FUEL GAS. |
| | |
| | 8) PROVIDE A COMBUSTION AIR CALCULATION FOR THE BOILER |
| | IN COMPLIANCE WITH SECTION 304.6.2 FBC-14 FUEL GAS. |
| | |
| | 9) SHEETS 1.5A & 3.1M: THE COMBUSTION AIR DUCT RUNS AT |
| | THE BOILER ROOM DO NOT MATCH- CHOOSE ONE METHOD OR THE |
| | OTHER. IF USING THE METHOD SHOWN ON SHEET 1.5A, |
| | RELOCATE THE LOCATION OF THE UPPER COMBUSTION AIR DUCT |
| | OPENING TO WITHIN 12 INCHES OF THE TOP OF THE ROOM. |
| | |
| | 10) INDICATE THE TYPE OF COMBUSTION AIR DUCT TO BE |
| | INSTALLED AND INDICATE HOW THE OPENING AT THE ROOF |
| | LEVEL WILL BE PROTECTED- SECTION 304.10 FBC-14 FUEL |
| | GAS. |
| | |
| | 11) 3.1M: PLEASE LABEL THE AHU ON THE FLOOR PLAN |
| | DRAWING AND PROVIDE SYMBOLS TO SHOW THE LOCATIONS OF |
| | THE REQUIRED DUCT SMOKE DETECTORS FOR THE AHU AND THE |
| | RTU- SECTION 606.2.1. |
| | A) INDICATE IF THE DETECTORS WILL BE CONNECTED TO A |
| | FIRE ALARM SYSTEM, OR IF NO FIRE ALARM, SHOW THE |
| | LOCATIONS OF AUDIBLE AND VISUAL SIGNALING DEVICES. |
| | |
| | 12) THE F TRANSFER GRILLS ARE UNDERSIZED FOR 4200 CFMS- |
| | SEE SECTION 601.5(2). SHOW HOW AIR IS BEING RETURNED |
| | FROM THE GRILLS TO THE AHU- NO RETURN DUCTS OR GRILLS |
| | ARE SHOWN. |
| | |
| | 13) CLARIFY THE PURPOSE OF EF-2 AND PROVIDE AN EXHAUST |
| | VENTILATION CALCULATION AND CONTROL OPERATION. |
| | |
| | 14) REFER TO SECTION C402.4.5.2 AND PROVIDE AN |
| | EQUIPMENT SCHEDULE FOR THE MOTORIZED DAMPER AT THE O/A |
| | INTAKE FOR THE AHU. A) AN AUTOMATIC SHUTOFF DAMPER IS |
| | REQUIRED FOR THE O/A SUPPLY FROM THE RTU. |
| | |
| | 15) PROVIDE SPECIFICATIONS FOR THE GLYCOL AND STEAM |
| | PIPING AND THE PIPE INSULATIONS. |
| | |
| | 16) REFER TO SECTION 1003.1 AND PROVIDE MANUFACTURER'S |
| | SPECIFICATIONS FOR THE STEAM KETTLE, THE LIQUOR TANK, |
| | AND ALL OTHER BREWERY TANKS AND EQUIPMENT. |
| | |
| | 17) 1.5A) ENLARGE THE PRINT SHOWN UNDER THE BREWERY |
| | TANKS AND EQUIPMENT- IT IS NOT LEGIBLE. |
| | |
| | 18) 3.1M: LABEL THE BREWERY TANKS AND EQUIPMENT AND |
| | PROVIDE WORKING CLEARANCE MEASUREMENTS ON THE PLAN. |
| | |
| | 19) REFER TO SECTION 401.4 AND VERIFY CLEARANCE |
| | DISTANCES FOR THE O/A INTAKE ARE IN COMPLIANCE. |
| | |
| | 20) REFER TO SECTION 401.5 AND INDICATE HOW THE O/A |
| | INTAKE OPENING WILL BE PROTECTED. SUBMIT A FLL. PRODUCT |
| | APPROVAL OR MIAMI-DADE NOA FOR A LOUVER IF TO BE USED. |
| | |
| | 21) PROVIDE DUCT HANGING AND CONNECTION DETAILS PER |
| | SMACNA STANDARDS AND TABLE C403.2.7.2 FBC-14 ENERGY |
| | CONSERVATION. |
| | |
| | 22) SHEET 3.4M: REFER TO SECTION 304.11 AND PROVIDE |
| | GUARDS AT THE ROOF EDGES IN PROXIMITY OF THE ACCU AND |
| | CHILLER. |
| | |
| | 23) 3.4M: ROOFTOP MECHANICAL INSTALLATION DETAILS ARE |
| | PROVIDED FOR BOTH BAR JOIST AND CONCRETE DECK- PLEASE |
| | CLARIFY THIS CONFLICT, AND PROVIDE COMPLETE WIND DESIGN |
| | CRITERIA PER SECTION 1609 FBC-14 BUILDING. SUBMIT A |
| | FLORIDA PRODUCT APPROVAL OR MIAMI-DADE NOA FOR THE ROOF |
| | STAND WITH APPLICABLE INSTALLATION DETAILS, ANCHORS, |
| | DESIGN PRESSURES ETC. CIRCLED HIGHLIGHTED, OR OTHERWISE |
| | MARKED BY THE ENGINEER OF RECORD. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |