Plan Review Notes
Plan Review Notes For Permit 16111261
Permit Number 16111261
Review Stop P
Sequence Number 2
Notes
Date Text
2017-04-25 16:45:062ND REVIEW
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
 PLUMBING COMMENTS:
  
 1. SHT. P3.4 THE HUB DRAIN SHALL CONNECT TO THE WET
 VENT DOWN STREAM OF BRANCH DRAIN OF WATER CLOSET. FBC
 PL 912.1
  
 2. SHT. P3.2 THE HUB DRAIN SHALL CONNECT TO THE WET
 VENT DOWN STREAM OF BRANCH DRAIN OF THE LAVATORY. FBC
 PL 912.1
  
 3.SHT. P3.8 THE NOTE UNDER THE TAG FOR RISER S-8 REFERS
 TO SHT. P3.7 S-8 RISER IS NOT SHOWN ON P3.7 PLEASE
 PROVIDE.
  
 4. SHT P3.8 WATER CLOSET IN HALF BATH IS NOT VENTED IT
 SHALL BE VENTED BEFORE IT CONNECTS TO THE BUILDING
 DRAIN. PER FBC PL901.2.1
  
 5. SHT. P3.7 + P3-9 APEAR TO BE THE SAME PLEAS CLARIFY.
 PER WPB AMEND TO FBC 107.2.1
  
  
 FYI A COMPLETE AND THOROUGH REVIEW CANNOT BE DONE AT
 THIS TIME. UPON RESUBMITTAL THERE MAYBE ADDITIONAL
 COMMENTS.
  
 WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES
 AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE
 AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW.
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved