| Plan Review Notes For Permit 16111255 |
| Permit Number |
16111255 |
|
| Review Stop |
M |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-12-08 14:33:05 | 1ST REVIEW FBC-2014 MECHANICAL, ENERGY CONSERVATION | | | CODES | | | PERMIT #1611255 | | | 12/8/16 | | | | | | 1) CORRECT THE ENERGYGAUGE FORM TO SHOW THE CORRECT | | | DATA FOR THE 4-TON HEAT PUMP SYSTEM. THE FORM IS | | | INDICATING IT TO BE A10-TON SYSTEM. | | | | | | 2) THE HEAT PUMP COOLING AND HEATING CALCULATIONS MUST | | | BEAR THE SIGNATURE AND SEAL OF THE ENGINEER OF RECORD- | | | SECTION C403.2.1 FBC-14 FBC-14 ENERGY CONSERVATION. | | | | | | 3) COMMISSIONING IS REQUIRED IN ACCORDANCE WITH SECTION | | | C408.1 FBC-14. PLEASE SUBMIT A COMMISSIONING PLAN OR | | | PROVIDE AN OUTLINE ON THE PLAN DETAILING THE | | | PROCEDURES. PLEASE NOTE THAT FINAL CO OF THE PROJECT IS | | | CONTINGENT ON SUBMITTAL OF THE FINAL COMMISSIONING | | | REPORT TO THE BUILDING OWNER | | | | | | 4) DEMAND CONTROLLED VENTILATION IS REQUIRED PER | | | SECTION C403.2.5.1. THE PLAN IS INDICATING ONLY RTU-4 | | | TO BE IN COMPLIANCE. | | | | | | 5) PLEASE PROVIDE A SUBMITTAL FOR THE CO SENSOR WITH AN | | | APPROVAL STAMP BY THE EOR. | | | | | | 6) PROVIDE COMPLETE ENGINEERING FOR INSTALLATION OF THE | | | RTU'S INCLUDING THE WIND DESIGN CRITERIA, AND | | | ATTACHMENT AND FASTENING DETAILS- SECTION 301.15. | | | | | | 7) SHOW THE LOCATION(S) OF THE UNIT HEATER ON THE | | | PLANS. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|