2017-02-09 14:37:53PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT TWO SETS OF ENERGY COMPLIANCE FORMS FOR THE
 NEW ADDITION. R103.1.1.2 CODE COMPLIANCE CERTIFICATION.
 THE BUILDING'S OWNER, THE OWNER'S ARCHITECT, OR OTHER
 AUTHORIZED AGENT LEGALLY DESIGNATED BY THE OWNER SHALL
 CERTIFY THAT THE BUILDING IS IN COMPLIANCE WITH THE
 CODE, AS PER SECTION 553.907, FLORIDA STATUTES, PRIOR
 TO RECEIVING THE PERMIT TO BEGIN CONSTRUCTION OR
 RENOVATION.
 -THE ENERGY FORMS THAT WERE SUBMITTED APPEAR TO HAVE
 SOME MISTAKES. THIS IS AN EXISTING 2 STOREY SINGLE
 FAMILY DWELLING WITH A FLAT ROOF AND A PROPOSED SMALL
 ADDITION. THE EXISTING STRUCTURE IS 1016 SQUARE FEET ON
 THE FIRST FLOOR AND 848 SQUARE FEET ON THE SECOND FLOOR
 FOR A TOTAL OF 1864 SQUARE FEET OF CONDITIONED SPACE.
 THE PROPOSED TWO STOREY ADDITION HAS 34 SQUARE FEET ON
 THE FIRST AND ON THE SECOND FLOOR, FOR A TOTAL OF 68
 SQUARE FEET. THE NEW TOTAL WITH THE PROPOSED ADDITION
 INCLUDED IS 1932 SQUARE FEET. THERE IS NO HIP ROOF OR
 COMPOSITION SHINGLES AS STATED ON THE FORM. THE
 ARCHITECT FOR THE ADDITION INDICATES THAT IT HAS AN
 UNVENTED ATTIC. PLEASE CLARIFY THE INFORMATION THAT IS
 LISTED ON THE ENERGY COMPLIANCE FORM.
  
 2) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS
 FOR THOSE PRODUCTS WHICH ARE REGULATED BY DCA RULE 9N-3
 THAT HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE
 DESIGNER OF RECORD. PROVIDE TWO COMPLETE PRODUCT
 APPROVALS WITH FL OR NOA NUMBERS INCLUDING INSTALLATION
 INSTRUCTIONS AND MAXIMUM DESIGN PRESSURES FOR THE TPO
 ROOFING MATERIAL AND THE JELD-WEN OUTSWING EXTERIOR
 DOOR.
 -THE INSTALLATION INSTRUCTIONS WITH THE SYSTEM TYPE,
 SYSTEM NUMBER, THE MAXIMUM DESIGN PRESSURE IDENTIFIED
 BY MARKING THEM ON THE DOCUMENTS IS REQUIRED FOR THE
 TPO ROOFING (FL5293-R-22). SUBMIT SIGNED AND SEALED
 ENHANCED FASTENING CALCULATIONS IF REQUIRED TO MEET THE
 WIND UPLIFT IN ROOF ZONES 2 AND 3. FBC-R301.2.1
 -THERE WERE NO PRODUCT APPROVAL DOCUMENTS SUBMITTED FOR
 THE EXTERIOR DOOR.
  
 3) SHOW COMPLIANCE WITH R806.5 UNVENTED ATTIC AND
 UNVENTED ENCLOSED RAFTER ASSEMBLIES. UNVENTED ATTIC
 ASSEMBLIES (SPACES BETWEEN THE CEILING JOISTS OF THE
 TOP STORY AND THE ROOF RAFTERS) AND UNVENTED ENCLOSED
 RAFTER ASSEMBLIES (SPACES BETWEEN CEILINGS THAT ARE
 APPLIED DIRECTLY TO THE UNDERSIDE OF ROOF FRAMING
 MEMBERS/RAFTERS AND THE STRUCTURAL ROOF SHEATHING AT
 THE TOP OF THE ROOF FRAMING MEMBERS/RAFTERS) SHALL BE
 PERMITTED IF ALL THE FOLLOWING CONDITIONS ARE MET:
  
 #1. THE UNVENTED ATTIC SPACE IS COMPLETELY CONTAINED
 WITHIN THE BUILDING THERMAL ENVELOPE.
  
 #2. NO INTERIOR CLASS I VAPOR RETARDERS ARE INSTALLED
 ON THE CEILING SIDE (ATTIC FLOOR) OF THE UNVENTED ATTIC
 ASSEMBLY OR ON THE CEILING SIDE OF THE UNVENTED
 ENCLOSED RAFTER ASSEMBLY.
  
 #3. WHERE WOOD SHINGLES OR SHAKES ARE USED, A MINIMUM
 1/4- INCH (6 MM) VENTED AIR SPACE SEPARATES THE
 SHINGLES OR SHAKES AND THE ROOFING UNDERLAYMENT ABOVE
 THE STRUCTURAL SHEATHING.
  
 #4. IN CLIMATE ZONES 5, 6, 7 AND 8 OF TABLE R301.1 OF
 THE FLORIDA BUILDING CODE, ENERGY CONSERVATION, ANY
 AIRIMPERMEABLE INSULATION SHALL BE A CLASS II VAPOR
 RETARDER, OR SHALL HAVE A CLASS III VAPOR RETARDER
 COATING OR COVERING IN DIRECT CONTACT WITH THE
 UNDERSIDE OF THE INSULATION.
  
 #5. EITHER ITEMS 5.1, 5.2 OR 5.3 SHALL BE MET,
 DEPENDING ON THE AIR PERMEABILITY OF THE INSULATION
 DIRECTLY UNDER THE STRUCTURAL ROOF SHEATHING.
  
 #5.1. AIR-IMPERMEABLE INSULATION ONLY. INSULATION SHALL
 BE APPLIED IN DIRECT CONTACT WITH THE UNDERSIDE OF THE
 STRUCTURAL ROOF SHEATHING.
  
 #5.2. AIR-PERMEABLE INSULATION ONLY. IN ADDITION TO THE
 AIR-PERMEABLE INSULATION INSTALLED DIRECTLY BELOW THE
 STRUCTURAL SHEATHING, RIGID BOARD OR SHEET INSULATION
 SHALL BE INSTALLED DIRECTLY ABOVE THE STRUCTURAL ROOF
 SHEATHING AS SPECIFIED IN TABLE R806.5 FOR CONDENSATION
 CONTROL.
  
 #5.3. AIR-IMPERMEABLE AND AIR-PERMEABLE INSULATION. THE
 AIR-IMPERMEABLE INSULATION SHALL BE APPLIED IN DIRECT
 CONTACT WITH THE UNDERSIDE OF THE STRUCTURAL ROOF
 SHEATHING AS SPECIFIED IN TABLE R806.5 FOR CONDENSATION
 CONTROL. THE AIR-PERMEABLE INSULATION SHALL BE
 INSTALLED DIRECTLY UNDER THE AIR-IMPERMEABLE
 INSULATION.
  
 #5.4. WHERE PREFORMED INSULATION BOARD IS USED AS THE
 AIR-IMPERMEABLE INSULATION LAYER, IT SHALL BE SEALED AT
 THE PERIMETER OF EACH INDIVIDUAL SHEET INTERIOR SURFACE
 TO FORM A CONTINUOUS LAYER.
  
  
  
  