| Plan Review Notes For Permit 16111013 |
| Permit Number |
16111013 |
|
| Review Stop |
FIRE |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-11-23 17:24:36 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | | | | 1) PROVIDE AN ISOLATION VALVE TO DUST COLLECTOR SYSTEM | | | AND TEST AT 200PSI. | | | | | | THE PROPOSED PROJECT IS ADDING ALL NEW PIPING AND | | | HEADS, IT DOES NOT INVOLVE RELOCATED HEADS AND, IT CAN | | | BE ISOLATED. | | | | | | 24.2.1.4 MODIFICATIONS AFFECTING 20 OR FEWER SPRINKLERS | | | SHALL NOT REQUIRE TESTING IN EXCESS OF SYSTEM WORKING | | | PRESSURE. | | | 24.2.1.6 MODIFICATIONS THAT CANNOT BE ISOLATED, SUCH AS | | | RELOCATED DROPS, SHALL NOT REQUIRE TESTING IN EXCESS OF | | | SYSTEM WORKING PRESSURE. | | | | | | ADDITIONALLY, THIS IS A HIGHER THAN NORMAL HAZARD | | | PROTECTION SYSTEM WHERE SYSTEM INTEGRITY IS ESSENTIAL. | | | | | | | | | 2) ADDITIONALLY, AN ISOLATION VALVE WILL ALSO FUNCTION | | | IN THE CASE OF COLLECTOR SPRINKLER ACTIVATION AND SHUT | | | DOWN WHILE MAINTAINING PORTECTION THROUGHOUT THE | | | BUILDING. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | | | | | | | | | | | | | |
|