| Plan Review Notes For Permit 16110820 |
| Permit Number |
16110820 |
|
| Review Stop |
FIRE |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-11-22 13:15:47 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | | | | 1) THE HYDRALIC CALCULATIONS DO NOT APPEAR TO MEET THE | | | FOLLOWING REQUIREMENTS OF NFPA 13D. | | | | | | CHAPTER 6 WATER SUPPLY | | | 6.2* WATER SUPPLY SOURCES. | | | 6.2.3* WHERE MORE THAN ONE DWELLING UNIT IS SERVED BY | | | THE SAME WATER SUPPLY PIPE, EACH DWELLING UNIT SHALL | | | HAVE AN INDIVIDUAL CONTROL VALVE THAT SERVES THE FIRE | | | SPRINKLER SYSTEM IN THAT DWELLING UNIT AND THE OWNER | | | SHALL HAVE ACCESS TO THE VALVE THAT CONTROLS THE | | | SPRINKLER SYSTEM IN THEIR UNIT. | | | | | | | | | CHAPTER 8 SYSTEM DESIGN | | | 8.1 DESIGN CRITERIA. | | | 8.1.1 DESIGN DISCHARGE. | | | 8.1.1.1 SPRINKLERS THAT ARE NOT LISTED WITH SPECIFIC | | | DISCHARGE CRITERIA. | | | (AREA 2) 8.1.1.1.1 THE SYSTEM SHALL PROVIDE A DISCHARGE | | | OF NOT LESS THAN 13 GPM (49 L/MIN) PER SPRINKLER | | | SIMULTANEOUSLY TO ALL OF THE DESIGN SPRINKLERS.( AREA | | | 2) | | | 8.1.1.1.2 THE SYSTEM SHALL PROVIDE A DISCHARGE OF NOT | | | LESS THAN 18 GPM (68 L/MIN) TO ANY SPRINKLER IN THE | | | SYSTEM. (BOTH AREAS) | | | | | | | | | 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | | ABOVE. | | | | | | | | | 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | | | | | | | |
|