| 2018-01-29 10:29:40 | PRELIMINARY REVIEW OF REVISED PLAN FROM ARCHITECT DAVID |
| | LAWRENCE. |
| | |
| | 1- IT LOOKS LIKE THE REVISED PLAN COMPLIES WITH THE |
| | WINDOW FALL PROTECTION AND SAFETY GLASS REQUIREMENTS. |
| | NEED TO REVISE WINDOW SCHEDULE ACCORDINGLY. |
| | |
| | |
| | |
| | RESIDENTIAL (R3) REVISION, SECOND BUILDING REVIEW |
| | CHECKLIST. |
| | CODE: FBC 5TH EDITION. |
| | |
| | 1- REVISED UPPER LIVING ROOM WINDOWS AND REVISED |
| | WINDOWS FOR BEDROOM #210 LOCATED ON THE NORTH EAST |
| | CORNER NEED TO COMPLY WITH THE WINDOW FALL PROTECTION |
| | REQUIREMENTS OF SEC. R312.2 FBC-RESIDENTIAL, 5TH |
| | EDITION (2014). PROVIDE COMPLETE DETAILS AND |
| | SPECIFICATIONS SHOWING COMPLIANCE WITH THE FALL |
| | PROTECTION. |
| | NOTE: THIS ALSO APPLIES TO THE MASTER BEDROOM WINDOWS |
| | AND ANY OTHER WINDOW WHERE THE BOTTOM OF THE WINDOW |
| | SILL IS LESS THAN 24" ABOVE FINISHED FLOOR AND MORE |
| | THAN 72" ABOVE FINISHED GRADE OR SURFACE BELOW. |
| | RESPONSE: SHEET A101 WAS REVISED SHOWING GUARDRAILS FOR |
| | ALL FOUR FIXED WINDOWS IN THE HALL BY THE MORNING |
| | BREAKFAST AREA, HALL 205 AND BEDROOM 210. THE GUARDRAIL |
| | WILL TAKE CARE OF THE SAFETY GLASS REQUIREMENTS. THESE |
| | FOUR DOORS ARE FIXED. THEY DON'T NEED TO COMPLY WITH |
| | THE WINDOW FALL PROTECTION. THE WINDOW FALL PROTECTION |
| | APPLIES TO THE WINDOWS ON BEDROOM 210 THAT ARE FACING |
| | EAST, THE WINDOWS ON MASTER TERRACE 214 AND THE WINDOWS |
| | ON MASTER BEDROOM THAT ARE FACING EAST. REVISE PLANS |
| | SHOWING COMPLIANCE WITH THE FALL PROTECTION FOR THOSE |
| | WINDOWS FOR ALL THE WINDOWS WHERE THE BOTTOM OF THE |
| | WINDOW SILL IS LESS THAN 24" ABOVE FINISHED FLOOR AND |
| | MORE THAN 72" ABOVE FINISHED GRADE OR SURFACE BELOW. |
| | |
| | 2- SIX DRAWINGS WERE REVISED AND RE-SUBMITTED. OWES |
| | $309.00 FOR REVISION RE-SUBMITTAL FEES. |
| | |
| | |
| | REMAINDER: (NOT ADDRESSED AS OF 02/06/17) |
| | BUILDING REVIEW WAS APPROVED ON 05/13/16 WITH PROVISO. |
| | PROVISO ITEMS NEED TO BE SUBMITTED BEFORE INSPECTIONS |
| | TO AVOID DELAYS/CONFLICTS. SEE COPY OF COMMENTS BELOW: |
| | |
| | BUILDING REVIEW APPROVED WITH PROVISO: |
| | 1- ENERGY CALCULATIONS SUBMITTED: REVISE ROOF FINISH |
| | MATERIAL INFORMATION ON PAGE 2 TO MATCH PLANS. |
| | 2- PROVIDE COMPLETE MANUFACTURER'S SPECS FOR ALL |
| | FIREPLACES SHOWN ON PLANS. NOTE: DESIGNER OF RECORD TO |
| | REVIEW/APPROVE PRIOR TO SUBMITTAL. |
| | 3- FLAT ROOF FLORIDA PRODUCT APPROVAL FL5680-R5 |
| | SUBMITTED: PROVIDE SIGNED AND SEALED RAS 117 |
| | CALCULATIONS FOR SELECTED ASSEMBLY W-55 AS REQUIRED BY |
| | NOTE #8 ON PAGE 2 OF 76. |
| | 4- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY |
| | FAC 61G20-3.002(33) FOR: |
| | A)ENTRY DOOR AS SPECIFIED ON PLANS. DRAWING NO |
| | "LAG-TEN" SUBMITTED DON'T CORRESPOND TO FLORIDA PRODUCT |
| | APPROVAL COVER PAGE FL15911-R1 SUBMITTED. |
| | B) EXTERIOR DOORS: FRENCH DOORS WITH SIDELITES, GARAGE |
| | SWING DOOR, LAUNDRY ROOM, CABANA BATHROOM AND CABANA |
| | STORAGE. |
| | 6- DESIGNER OF RECORD TO APPROVE ABOVE PRODUCT |
| | APPROVALS. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |