| Plan Review Notes For Permit 16110753 |
| Permit Number |
16110753 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-12-08 12:56:54 | 1ST REVIEW | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER LL | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES | | | BUILDING DIVISION | | | 561-805-6711 | | | [email protected] | | | | | | PLUMBING COMMENTS: | | | | | | 1. SHT. A5.1 THE VENT ON THE WC IN THE SECOND FLOOR | | | BATHROOM SHALL BE ON THE LAVATORY CORRECT ON THE FLOOR | | | PLAN AND RISER DIAGRAM. PER FBC RES P3108.1 | | | | | | 2.THE FIXTURES IN THE MASTER BATHROOM SHALL ALL BE | | | CONNECTED TOGETHER TO A SEPARATE BRANCH AS A WET VENT | | | AND THEN CONNECT TO BUILDING DRAIN SEPARATELY FROM THE | | | WASHING MACHINE CORRECT ON FLOOR PLAN AND RISER | | | DIAGRAM. PER FBC RES P3108.1 | | | | | | 3. A CLEAN OUT IS REQUIRED AT THE BASE OF EACH WASTE OR | | | SOIL STACK. PER FBC RES P3005.2.6 | | | | | | 4. SHOW GAS PIPING ON FLOOR PLAN. WPB AMEND TO FBC | | | 107.2.1 |
|