| 2017-05-05 17:30:18 | RESIDENTIAL (R3) ADDITION/ALTERATION, THIRD BUILDING |
| | REVIEW CHECKLIST. |
| | CODE: FBC 5TH EDITION (2014). |
| | |
| | 1- REVISE ENERGY CALCULATIONS FORM R402-2014 SUBMITTED: |
| | A) OWNER OR LEGALLY OWNER'S DESIGNATED AGENT NEEDS TO |
| | SIGN AND DATE BOTTOM OF FORM AS REQUIRED BY SEC. |
| | R103.1.1.2 FBC-ENERGY CONSERVATION, 5TH EDITION (2014). |
| | RESPONSE: REPEAT COMMENT. |
| | |
| | B) THE WINDOW AREA ON ITEM #6(C) IS INCORRECT. NEED TO |
| | INCLUDE ALL WINDOWS IN THE NEW PLAYROOM AND NEED TO |
| | INCLUDE THE SLIDING GLASS DOORS AS REQUIRED BY SEC. |
| | R405.5.3.3 FBC-ENERGY CONSERVATION. |
| | RESPONSE: REPEAT COMMENT. |
| | |
| | C) REVISE WALL INFORMATION ON ITEM #9. EXTERIOR MASONRY |
| | WALL REQUIRES MIN. R-4 INSULATION ON THE INTERIOR SIDE |
| | OF THE WALL AND MIN. R-3 INSULATION ON THE EXTERIOR |
| | SIDE OF THE WALL AS REQUIRED BY TABLE R402A OF THE |
| | PRESCRIPTIVE ENERGY CALCULATIONS SUBMITTED. SEE |
| | FOOTNOTE #4. |
| | RESPONSE: REPEAT COMMENT. |
| | |
| | D) HVAC SIZING CALCULATIONS IS REQUIRED. REVISE ITEM |
| | #14. IT IS NOT N/A. |
| | RESPONSE: REPEAT COMMENT. |
| | |
| | E) CEILING INSULATION IN ITEM #10(B) WAS CHANGED TO |
| | R19. TABLE R402A REQUIRES R30. INSULATION . REVISE AS |
| | REQUIRED. NOTE: COORDINATE WITH ITEM #3 BELOW. |
| | |
| | NOTE: |
| | LABEL FOR THE DOORS AND WINDOWS U-FACTOR AND SHGC |
| | FACTOR WILL BE REQUIRED TO VERIFY COMPLIANCE WITH THE |
| | ENERGY CALCULATIONS SUBMITTED. |
| | |
| | 2- PROVIDE COMPLETE DETAILS AND SPECIFICATIONS SHOWING |
| | HOW THE EXTERIOR WALL IS GOING TO HAVE R-6 INSULATION |
| | IN THE INTERIOR SIDE OF THE WALL AND R-4.1 INSULATION |
| | IN THE EXTERIOR SIDE OF THE WALL AS REQUIRED BY TABLE |
| | R402A OF PRESCRIPTIVE ENERGY CALCULATIONS SUBMITTED. |
| | SEC. R103.2 FBC-ENERGY CONSERVATION. |
| | RESPONSE: REPEAT COMMENT. |
| | |
| | 3- PRESCRIPTIVE ENERGY CALCULATIONS SUBMITTED REQUIRE |
| | R-30 ROOF INSULATION. ROOF FRAMING PLAN AND TYPICAL |
| | WALL SECTION SPECIFY 2 X 10 ROOF JOISTS. R-30 BATT |
| | INSULATION IS ABOUT 9-1/2 INCHES THICK. THERE IS NO |
| | ROOM FOR THE REQUIRED 1 INCH MIN. SPACE REQUIRED BY |
| | SEC. R806.3 FBC-RESIDENTIAL FOR VENTILATION. REVISE AS |
| | REQUIRED TO COMPLY WITH THE ENERGY CALCULATIONS. |
| | RESPONSE: REPEAT COMMENT. TABLE R402A REQUIRES R30. |
| | COORDINATE WITH ITEM #1(E) ABOVE. |
| | |
| | 4- TYPICAL EXTERIOR WALL DETAIL ON SHEET S.2 AND ROOF |
| | FRAMING PLAN ON SHEET S.3 SPECIFY 2 X 10 ROOF JOISTS. |
| | THIS ROOF JOIST SIZE DOESN'T ALLOW ROOF CROSS |
| | VENTILATION AS REQUIRED BY SEC. R806.3 FBC-RESIDENTIAL, |
| | 5TH EDITION (2014). CROSS VENTILATION REQUIRES A LEAST |
| | 1 INCH SPACE BETWEEN THE INSULATION AND THE BOTTOM OF |
| | THE ROOF SHEATHING. R-30 INSULATION IS ABOUT 9-1/2" |
| | THICK, THEREFORE THE 1 INCH SPACE IS NOT PROVIDED. |
| | REVISE AS REQUIRED. |
| | RESPONSE: REPEAT COMMENT. |
| | |
| | 5- NEW FLAT ROOF NOA 16-0413.06 SUBMITTED: |
| | A) CLEARLY IDENTIFY WHICH APPROVED FLAT ROOF ASSEMBLY |
| | IS GOING TO BE INSTALLED TO VERIFY COMPLIANCE WITH THE |
| | DESIGN PRESSURES REQUIRED BY SEC. R301.1 |
| | FBC-RESIDENTIAL. |
| | RESPONSE: REPEAT COMMENT. |
| | |
| | B) IF SELECTED ASSEMBLY DOESN'T MET THE DESIGN |
| | PRESSURES REQUIRED BY SEC. R301.1 FBC-RESIDENTIAL, THEN |
| | SIGNED AND SEALED RAS 117 CALCULATIONS WILL BE |
| | REQUIRED. SEE GENERAL LIMITATION #7 ON LAST PAGE OF NOA |
| | SUBMITTED. APPROVED ASSEMBLIES THAT ARE LIMITED BY |
| | GENERAL LIMITATION #9 MAY NOT BE USED IF THE DESIGN |
| | PRESSURES ARE TOO LOW. LIMITATION #9 DOESN'T ALLOW RAS |
| | 117 CALCULATIONS. |
| | RESPONSE: REPEAT COMMENT. RESPONSE LETTER STATES THAT |
| | "INFORMATION HAS BEEN UPDATED ON RAS 17 CALCULATION". |
| | SIGNED AND SEALED RAS 117 CALCULATIONS WERE NOT |
| | SUBMITTED. |
| | |
| | C) ENGINEER OF RECORD TO REVIEW AND APPROVE IN WRITING |
| | ABOVE PRODUCT APPROVAL AS REQUIRED BY SEC. 107.3.4.1 |
| | CITY AMENDMENTS. |
| | |
| | NOTES: |
| | ****A) PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH |
| | COMMENT TO EXPEDITE THE REVIEW PROCESS. |
| | ***B) PLEASE INSERT ANY REVISED DRAWING AND REMOVE OLD |
| | ONE. DON'T STAPLE OLD DRAWINGS. SUBMIT OLD DRAWINGS FOR |
| | REFERENCE. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |